Cyclic scheduling in 3-machine robotic ow shops

نویسندگان

  • Yves Crama
  • Joris van de Klundert
چکیده

We consider a robotic ow shop model in which a single robot is responsible for the transportation of parts between machines. For reasons of simplicity, when the shop is to produce a large number of identical parts, the robot usually performs repeatedly a xed sequence of activities. This sequence of activities is called a 1-unit cycle if each execution of the sequence results in the production of exactly one part. It has been conjectured that 1-unit cycles yield optimal production rates for 3-machine robotic ow shops. We establish the validity of this conjecture. keywords : cyclic scheduling, sequencing, automated manufacturing, ow shop.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic

In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...

متن کامل

بهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین

In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...

متن کامل

A scalarization-based method for multiple part-type scheduling of two-machine robotic systems with non-destructive testing technologies

This paper analyzes the performance of a robotic system with two machines in which machines are configured in a circular layout and produce non-identical parts repetitively. The non-destructive testing (NDT) is performed by a stationary robotic arm located in the center of the circle, or a cluster tool. The robotic arm integrates multiple tasks, mainly the NDT of the part and its transition bet...

متن کامل

A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups

We consider a problem of scheduling jobs in two-machine no-wait ow shops for which the objective is to minimize the makespan. Each job, upon completion of its processing on the rst machine, must be transferred immediately to the second machine due to a no-wait in process constraint. Every job requires a setup time on each machine before it is processed. The setup on the second machine is antici...

متن کامل

Generalized Cyclic Open Shop Scheduling and a Hybrid Algorithm

In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016