AFSCN scheduling: How the problem and solution have evolved

نویسندگان

  • Laura Barbulescu
  • Adele E. Howe
  • L. Darrell Whitley
چکیده

The Air Force Satellite Control Network (AFSCN) coordinates communications to more than 100 satellites via nine ground stations positioned around the globe. Customers request an antenna at a ground station for a specific time window along with possible alternative slots. Typically, 500 requests per day result in more than 100 conflicts, which are requests that cannot be satisfied because other tasks need the same slot. Scheduling access requests is referred to as the Satellite Range Scheduling Problem (SRSP). This paper presents an overview of three key issues: 1) how has the problem changed over the last 10 years, 2) what algorithms work best and 3) what objective function is appropriate for AFSCN. We compared data sets from 1992 and from 2002/2003 and found significant differences in the problems. Our evaluation of solutions focus on three algorithms: local search, Gooley’s algorithm from AFIT, and the Genitor genetic algorithm. It can be shown that local search (and therefore metaheuristics based on local search) fail to compete with Gooley’s algorithm and Genitor. Finally, while all prior work on AFSCN minimizes request conflicts, we explore an alternative objective function. Because human schedulers must eventually schedule all requests, it might be better to optimize schedules for “repairability.” Our results suggest that minimizing schedule overlaps makes it easier to fit larger requests into the schedule. ∗This research was partially supported by a grant from the Air Force Office of Scientific Research, Air Force Materiel Command, USAF, under grants number F49620-00-1-0144 and F49620-03-1-0233. The U.S. Government is authorized to reproduce and distribute reprints for Governmental purposes notwithstanding any copyright notation thereon. Darrell Whitley was also supported by the National Science Foundation under Grant No. 0117209. Adele Howe was also supported by the National Science Foundation under Grant No. IIS-0138690.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture

Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...

متن کامل

An Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations

Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...

متن کامل

Understanding Performance Tradeoffs in Algorithms for Solving Oversubscribed Scheduling

In recent years, planning and scheduling research has paid increasing attention to problems that involve resource oversubscription, where cumulative demand for resources outstrips their availability and some subset of goals or tasks must be excluded. Two basic classes of techniques to solve oversubscribed scheduling problems have emerged: searching directly in the space of possible schedules an...

متن کامل

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System

Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs.  In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Mathematical and Computer Modelling

دوره 43  شماره 

صفحات  -

تاریخ انتشار 2006