Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry
نویسندگان
چکیده
Many research initiatives carried out in production management consider process planning and operations scheduling as two separate and sequential functions. However, in certain contexts, the two functions must be better integrated. This is the case in divergent production systems with co-production (i.e. production of different products at the same time from a single product input) when alternative production processes are available. This paper studies such a context and focuses on the case of drying and finishing operations in a softwood lumber facility. The situation is addressed using a single model that simultaneously performs process planning and scheduling. We evaluate two alternative formulations. The first one is based on mixed integer programming (MIP) and the second on constraint programming (CP). We also propose a search procedure to improve the performance of the CP approach. Both approaches are compared with respect to their capacity to generate good solutions in short computation time.
منابع مشابه
An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case
Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملEvaluation of Pull Strategies in Lumber Production Planning: a Case Study
This paper addresses the problem of production planning in a divergent lumber production environment. It aims at analyzing operational performance changes by introducing pull production flow control mechanisms into the production part of the lumber supply chain. An agent-based simulation evaluation is performed using an experimentation platform based on a distributed advanced planning and sched...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 38 شماره
صفحات -
تاریخ انتشار 2011