Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem

نویسندگان

  • Broos Maenhout
  • Mario Vanhoucke
چکیده

The efficient management of nursing personnel is of critical importance in a hospital’s environment comprising a vast share of the hospital’s operational costs. The nurse scheduling process affects highly the nurses’ working conditions, which are strongly related to the provided quality of care. In this paper, we consider the rostering over a mid-term period that involves the construction of duty timetables for a set of heterogeneous nurses. In scheduling nursing personnel, the head nurse is typically confronted with various (conflicting) goals complying with different priority levels, which represent the hospital’s policies and the nurses’ preferences. In constructing a nurse roster, nurses need to be assigned to shifts in order to maximize the quality of the constructed timetable satisfying the case-specific time related constraints imposed on the individual nurses’ schedules. Personnel rostering in healthcare institutions is a highly constrained and difficult problem to solve and is known to be NP-hard. In this paper, we present an exact branch-and-price algorithm for solving the nurse scheduling problem incorporating multiple objectives and discuss different branching and pruning strategies. Detailed computational results are presented comparing the proposed branching strategies and indicating the beneficial effect of various principles encouraging computational efficiency.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cyclic Preference Scheduling for Nurses Using Branch and Price

This paper presents a new methodology to solve the cyclic preference scheduling problem for hourly workers. The focus is on nurse rostering but is applicable to any organization in which the midterm scheduling decision must take into account a complex of legal, institutional, and preferential constraints. The objective is to strike a balance between satisfying individual preferences and minimiz...

متن کامل

An Improved Optimization Model for Scheduling of a Multi-Product Tree-Like Pipeline

In the petroleum supply chain, oil refined products are often delivered to distribution centers by pipelines since they provide the most reliable and economical mode of transportation over large distances. This paper addresses the optimal scheduling of a complex pipeline network with multiple branching lines. The main challenge is to find the optimal sequence and time of product injections/deli...

متن کامل

Solving a nurse rostering problem considering nurses preferences by graph theory approach

Nurse Rostering Problem (NRP) or the Nurse Scheduling Problem (NSP) is a complex scheduling problem that affects hospital personnel on a daily basis all over the world and is known to be NP-hard.The problem is to decide which members of a team of nurses should be on duty at any time, during a rostering period of, typically, one month.It is very important to efficiently utilize time and effort, ...

متن کامل

A multi-objective mathematical model for nurse scheduling problem with hybrid DEA and augmented ε-constraint method: A case study

The efficient management of nursing personnel is of vital importance in a hospital’s environment comprising a vast share of the hospital’s operational costs. In the nurse scheduling problem (NSP), the target is to allocate shifts to the nurses in order to satisfy the hospital’s demand during the planning horizon by considering different objective functions. This paper presents a multi-objective...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 13  شماره 

صفحات  -

تاریخ انتشار 2010