Hybrid Job Shop and parallel machine scheduling problems: minimization of total tardiness criterion

نویسندگان

  • Frédéric Dugardin
  • Hicham Chehade
  • Lionel Amodeo
  • Farouk Yalaoui
  • Christian Prins
چکیده

Scheduling is a scientific domain concerning the allocation of limited tasks over time. The goal of scheduling is to maximize (or minimize) different criteria of a facility as makespan, occupation rate of a machine, total tardiness ... In this area, scientific community usually group the problem with, on one hand the system studied, defining the number of machines (one machine, parallel machine), the shop type (as Job shop, Open shop or Flow shop), the job characteristics (as pre-emption allowed or not, equal processing times or not) and so on. On the other hand scientists create these categories with the definition of objective function (it can be single criterion or multiple criteria). The main goal of this chapter is to present model and solution method for the total tardiness criterion concerning the Hybrid Job Shop (HJS) and Parallel Machine (PM) Scheduling Problem. The total tardiness criterion seems to be the crux of the piece in a society where service levels become the central interest. Indeed, nowadays a product often undergoes different steps and then traverses different structures along the supply chain, this involve in general a due date at each step. This can be minimized as a single objective or as a part of a multiobjective case. On the other hand, the structure of a hybrid job shop consists in two types of stages with single and parallel machines. That is why we propose to point out the parallel machine PM problem domain which can be used to solve the hybrid job shop scheduling system. This hybrid characteristic of a job shop is very common in industry because of two major factors: at first some operations are longer than other ones and secondly flexible factory. Indeed, if some operations too long; they can be accelerated by technical engineering but if it is not possible they must be parallelized to avoid bottlenecks. Another potential cause is the flexible factory: if a factory does many different jobs these jobs can perhaps pass through a central operation and so the latter must increase his efficiency. This work is organized as follow: firstly a state of the art concerning PM is realized. The latter leads us to a the HJS problem where we summarize a state of the art on the minimization of the total tardiness and in a second step we present several results concerning efficient heuristic methods to solve the Hybrid Job Shop problem such as Genetic Algorithm or Ant Colony System algorithm. We also deal with multi-objective

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Is a Unit - Time Job Shop Not Easierthan

This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...

متن کامل

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Minimizing the total tardiness in a flexible job-shop

In this article, we consider the minimization of the total tardiness in a flexible job-shop. In our knowledge, this criterion is not previously studied for this type of shop configuration. The total tardiness criterion was mainly considered in the single machine problem (Chu [Chu92] and Souissi et al. [SKC04]). Few references studied this criterion in a job-shop configuration. The priority rule...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008