Acfm above a Hemispherical Pit in an Aluminum Block
ثبت نشده
چکیده
Much of the recent research at the NDE Centre at UCL has revolved round the study of the scattering of thin skin electromagnetic fields by a fatigue crack. The early work concentrated on the perturbations to the surface electric field (ACPD), while the more recent work involved the scattered magnetic field (ACFM). The Centre has recently become involved in a collaborative project, a part of which involves the detection and sizing of pits in mild steels using ACFM and other inspection techniques, and the purpose of this paper is to study the complementary problem of pit detection in non-magnetic conductors. The case of a hemispherical pit was initially chosen on grounds of simplicity, since the modeling work can be done in spherical polar coordinates, whereas the more general case of a spherical cap would require the use of bipolar coordinates. As was the case with most of the fatigue crack modeling, it was assumed initially that the unperturbed magnetic field was uniform.
منابع مشابه
A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study
The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...
متن کاملUse of a mixed integer programming model to achieve an optimum size of blast block in open-pit mining with regard to size of mineable block using fuzzy logic approach
In this paper, we present an integrated model to find the optimum size of blast block that uses (i) a multi-criteria decision-making method to specify the applicable size of the mineable block; (ii) a linear programming method for the selection of the blasted areas to be excavated and in deciding the quantity of ores and wastes to be mined from each one of the selected blocks. These two methods...
متن کاملA New Algorithm for Determining Ultimate Pit Limits Based on Network Optimization
One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کامل