The Kek/jaeri Joint Project; Status of Design and Development
نویسنده
چکیده
The Japan Hadron Facility of KEK and the Neutron Science Project of JAERI have been merged to one project; the KEK/JAERI Joint Project for high-intensity proton accelerator facility. The purpose of the Joint Project is to pursue frontier science and nuclear technology. The accelerator for the Joint Project comprises a normaland super-conducting linac, a 3-GeV rapid cycling synchrotron and a 50-GeV synchrotron. The normal conducting linac provides a 400-MeV beam to the 3-GeV synchrotron at 25 Hz and to the superconducting linac at 25 Hz simultaneously. The superconducting linac provides a 600-MeV beam to an accelerator-driven nuclear waste transmutation system (ADS). The status of the linac design and the development work will be presented.
منابع مشابه
Synchrotron Rf System for the Jaeri-kek Joint Project
A synchrotron rf system has been designed for the JAERI-KEK Joint Project for High-Intensity Proton Accelerators in Japan. A new type of rf cavity loaded with MA(Magnetic Alloy) cores will be used for synchrotrons in order to achieve the high field gradient for the rf acceleration. The status of R&D on the cavity is also reported.
متن کاملDevelopment of a Dtl Quadrupole Magnet with a New Electroformed Hollow Coil for the Jaeri/kek Joint Project
Quadrupole electromagnets have been developed with a hollow coil produced using an improved periodic reverse electroforming. These will be installed in each of the drift tubes of the DTL (324 MHz) as part of the JAERI/ KEK Joint Project at the high-intensity proton accelerator facility. Measurements of the magnets’ properties were found to be consistent with computer-calculated estimated. The d...
متن کاملStructure Design of the Annular Coupled Structure Linac for the Jaeri/kek Joint Project
The normal conducting coupled-cavity linac with the Annular Coupled Structure (ACS) is adopted for 190-400 MeV part of high intensity proton linac for the JAERI/KEK Joint Project. The operating frequency is 972 MHz and the 23 modules will be constructed. The basic configuration is based on that investigated for L-band (1296 MHz) in the previous Japan Hadron Project research. However, the struct...
متن کاملA Control System of the Joint-project Accelerator Complex
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. Phase 1 of the Joint Project has been approved and recently started its construction at the JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at the KEK site at Tsukuba for R&D purposes...
متن کاملDigital Rf Control System for 400-mev Proton Linac of Jaeri/kek Joint Project
At the proton linac of the JAERI and KEK Joint Project, an accelerating electric field stability of +-1% in amplitude and +-1 degree in phase is required for the RF system. In order to accomplish these requirements, a digital feedback system is adopted for flexibility of the feedback (FB) and feed forward (FF) algorism implimentation. FPGAs are used for the real-time FB system. A DSP board is a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -