Two New Parallel Algorithms for Solving the Job Shop Problem Working Paper

نویسندگان

  • Stefan Bock
  • Hergen Busch
  • Otto Rosenberg
چکیده

In this paper the job shop scheduling problem is considered. Since this well known problem is NP hard nding an optimal solution for a given instance is often very diicult. Although newest hardware solutions are used it is nearly impossible to solve even instances of moderate size (like 15 jobs processed on 15 machines) in a reasonable time. Due to this fact several heuristic algorithms have been developed in the last 25 years. But nding good results for large job shop problems becomes very time consuming while regarding a realistic time limit leads to poor results. Due to this the use of distributed systems seems to be a promising approach. Nowadays many companies have connected their personal computers to local area networks (LANs). These LANs can be used as a parallel computer. In this paper parallel concepts for two well known sequential algorithms for solving the job shop problems are presented. They are additionally designed for a practical use in business. Therefore they use no special attribute of speciic parallel systems. It can be shown that the parallel version delivers comparable results in clearly better time limits as the sequential heuristics or clearly better results in the same time limit.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

متن کامل

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

کمینه‌سازی حداکثر زمان تکمیل در مسأله زمانبندی تولید کارگاهی با ماشینهای موازی

In this paper the problem of job shop scheduling with parallel machines in each stages is discussed. The objective is to minimize the maximum completion time (makespan).This problem is a combination of two classic problems of job shop and parallel machines which in this case parallel machines has been used as kind of flexibility in the job shop problem. The review of literature has shown that t...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

Hybrid artificial immune system and simulated annealing algorithms for solving hybrid JIT flow shop with parallel batches and machine eligibility

This research deals with a hybrid flow shop scheduling problem with parallel batching, machine eligibility, unrelated parallel machine, and different release dates to minimize the sum of the total weighted earliness and tardiness (ET) penalties. In parallel batching situation, it is supposed that number of machine in some stages are able to perform a certain number of jobs simultaneously. First...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007