Two-settlement electricity markets with price caps and Cournot generation firms

نویسندگان

  • Jian Yao
  • Shmuel S. Oren
  • Ilan Adler
چکیده

We compare two alternative mechanisms for capping prices in two-settlement electricity markets. With sufficient lead time, forward market prices are implicitly capped by competitive pressure of potential entry that will occur when forward prices rise above some backstop price. Another more direct approach is to cap spot prices through a performance-based regulatory intervention. In this paper we explore the implications of these two alternative mechanisms in a two-settlement Cournot equilibrium framework. We formulate the market equilibrium as a stochastic equilibrium problem with equilibrium constraints (EPEC) capturing congestion effects, probabilistic contingencies and horizontal market power. As an illustrative test case, we use the 53-bus Belgian electricity network with representative generator costs but hypothetical demand and ownership structure. Compared to a price-uncapped two-settlement system, a forward cap increases firms’ incentives for forward contracting, whereas a spot cap reduces such incentives. Moreover, in both cases, more forward contracts are committed as the generation resource ownership structure becomes more diversified. keyword: OR in energy, Electricity Markets, Cournot Equilibrium, Mathematical Program with Equilibrium Constraints, Equilibrium Problem with Equilibrium Constraints.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Computing Cournot Equilibria in Two Settlement Electricity Markets with Transmission Constraints

We formulate a two-settlement equilibrium in competitive electricity markets as a subgame-perfect Nash equilibrium in which each generation firm solves a Mathematical Program with Equilibrium Constraints (MPEC), given other firms’ forward and spot strategies. We implement two computational approaches, one of which is based on a Penalty Interior Point Algorithm and the other is based on a steepe...

متن کامل

Analyzing Capacity Withholding in Oligopoly Electricity Markets Considering Forward Contracts and Demand Elasticity

In this paper capacity withholding in an oligopolistic electricity market that all Generation Companies (GenCos) bid in a Cournot model is analyzed and the capacity withheld index, the capacity distortion index and the price distortion index are obtained and formulated. Then a new index, Distortion-Withheld Index (DWI), is proposed in order to measure the potential ability of market for capacit...

متن کامل

Cournot equilibria in two-settlement electricity markets with system contingencies

We study Nash equilibrium in two-settlement competitive electricity markets with horizontal market power, flow congestion, demand uncertainties and probabilistic system contingencies. The equilibrium is formulated as a stochastic Equilibrium Problem with Equilibrium Constraints (EPEC) in which each firm solves a stochastic Mathematical Program with Equilibrium Constraints (MPEC). We assume a no...

متن کامل

PWP-089 Capacity Constrained Supply Function Equilibrium Models of Electricity Markets: Stability, Non- decreasing constraints, and Function Space Iterations

In this paper we consider a supply function model of an electricity market where strategic firms have capacity constraints. We show that if firms have heterogeneous cost functions and capacity constraints then the differential equation approach to finding the equilibrium supply function may not be effective by itself because it produces supply functions that fail to be non-decreasing. Even when...

متن کامل

Market Clearing Mechanisms under Uncertainty

Electricity markets face a substantial amount of uncertainty. While traditionally this uncertainty has been due to varying demand, with the integration of larger proportions of volatile renewable energy, added uncertainty from generation must also be faced. Conventional electricity market designs cope with uncertainty by running two markets: a market that is cleared ahead of time, followed by a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 181  شماره 

صفحات  -

تاریخ انتشار 2007