Project selection and scheduling with uncertain net income and investment cost
نویسندگان
چکیده
This paper discusses an R & D project selection and scheduling problem in which there are no historical data about the project parameter values. The net income and investment cost in the problem are given by experts’ evaluations and treated as uncertain variables. The different interactions among projects and the flexibility of project beginning time are considered. A new cost overrun risk is employed and a new optimisation model for R & D project selection and scheduling problem is given. Furthermore, deterministic equivalents of the model are presented and a genetic algorithm is designed for solving the proposed problem. As an illustration, a numerical example is provided. 2014 Elsevier Inc. All rights reserved.
منابع مشابه
A stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملProject Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Applied Mathematics and Computation
دوره 247 شماره
صفحات -
تاریخ انتشار 2014