AMS209 Final Project

نویسنده

  • Xingchen Yu
چکیده

In the project, we explore LU decomposition with or without pivoting to compute systems of linear equations which are fundamental to any linear algebra problems. We used modular programming in Fortran to perform LU decomposition, forward and backward substitution for three different systems of linear equations. We used python to execute Fortran and compare results generated from our Fortran program with that from python Numpy package. As expected, the results are the same for our Fortran program and Numpy package. Lastly, we plot the requested matrix plot using Matplot from python. All of the three systems of equations were automatically executed at once as well and plots.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

تعیین ضریب عملکرد پروژه در مدیریت ارزش کسب شده با استفاده از مدیریت ریسک به منظور تخمین نتایج پایانی کار پیمانکاران

One of the common questions in all projects, is "How much would be the final cost of the project?" or "How much would be the completion duration of the project?". Earned Value Management presents a method for estimation of these results. In general methods and formula of Earned Value Management, future trend of project, are anticipated completely based on its previous trend, and changes in envi...

متن کامل

Developing a Theoretical and Operational Knowledge Audit Model for Project- Based Organizations

Background/aim. Considering the underlying role played by knowledge management in project-based organizations; and, the fact that knowledge audit is the most important step in supplying, maintaining and updating the content of knowledge management systems; this research effort is aimed at designing an appropriate knowledge audit model based on the requirements and factors of knowledge audit in ...

متن کامل

بررسی فاصله زمانی انجام تحقیق، تهیه مقاله، اعلام وصول، تائیدیه، انتشار و عوامل مرتبط با آن در مجلات علمی پژوهشی دندانپزشکی کشور در سال‌های 1390-1389

Abstract Background: Long delays in getting a paper published in a medical journal may affect motivation for research. The aim of this study was to evaluate the duration of the research, and the average interval between the completion of a research project and the publication of the research article in dental research journals. Materials and methods: In this cross sectional study, all eligi...

متن کامل

Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry

Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015