NEW ENGLAND COMPLEX SYSTEMS INSTITUTE Complex Systems Engineering Pr inciples — Active Response and Soft Failure : A visit to the US Army Corps of Engineers in New Orleans

نویسندگان

  • Yaneer Bar-Yam
  • Paul Seguin
چکیده

Science for the challenges of society. Preface: The U.S. Army Corps of Engineers (USACE) invited Professor Bar-Yam, president of the New England Complex Systems Institute, to give an executive program to senior management to provide training in complex systems science concepts and their application to areas of interest to the USACE. In preparation for this program, Professor Bar-Yam was provided a tour of the USACE engineering and construction efforts in New Orleans. These efforts were developed following Hurricane Katrina under the supervision of Task Force Hope of the Mississippi Valley Division of the Civil Works programs of the USACE. Tours of the new pump station at the 17th St. Canal and the surge protection barrier by boat were included, as well as a visit to the Gentilly neighborhood. Gentilly was largely destroyed by flooding during Katrina, similarly to the Ninth Ward, which has received more media attention. The tour provided key information about the opportunities and challenges facing the civil works program of the USACE, including the natural, social and technological components of the systems being confronted, and the organizational structures within USACE that are used to accomplish their tasks. Project Hope is currently at the peak of construction in view of a completion deadline of June 2011. Along with other examples within USACE, the relevant " lessons learned " from the project will inform the executive program. Following the tour, NECSI met with Col. Gunter and risk reduction specialist Reuben Mabry to discuss some insights from complex systems science that may inform future efforts to achieve risk reduction beyond the current program plans. This report describes some of the principles at work in Project Hope and the complex systems insights discussed with Col. Gunter and Mr. Mabry.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

Requirements Engineering Model in Designing Complex Systems

This research tends to development of the requirements elicitation methodology with regard to operational nature and hierarchical analysis for complex systems and also, regarding available technologies. This methodology applies Analytic Hierarchy Process (AHP) and Analytic Network Process (ANP) to ensure traceability of planned qualitative and quantitative data from requirements to available te...

متن کامل

Requirements Engineering Model in Designing Complex Systems

This research tends to development of the requirements elicitation methodology with regard to operational nature and hierarchical analysis for complex systems and also, regarding available technologies. This methodology applies Analytic Hierarchy Process (AHP) and Analytic Network Process (ANP) to ensure traceability of planned qualitative and quantitative data from requirements to available te...

متن کامل

A new idea for exact solving of the complex interval linear systems

In this paper‎, ‎the aim is to find a complex interval vector [Z] such that satisfies the complex interval linear system C[Z]=[W]‎. ‎For this‎, ‎we present a new method by restricting the general solution set via applying some parameters‎. ‎The numerical examples are given to show ability and reliability of the proposed method.

متن کامل

An Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems

General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010