A study of cash flows in projects with fuzzy activity durations

نویسندگان

  • Alexander Maravas
  • John Paris Pantouvakis
چکیده

In order to deal with imprecision inherent in the planning and scheduling of projects, various extensions of CPM (Critical Path Method) and PERT (Program Evaluation and Review Technique) have been proposed in the literature. The main aim of these studies has mainly been the application of Fuzzy Set Theory in the computation of activity start and completion dates, and consequently in the calculation of the project completion time, and of the critical path. As a step forward, this paper studies cash flows in project networks whose activity durations are represented with fuzzy numbers. The paper aims at formulating a methodology for generating cash flows based upon the fuzzy dates calculated with the algorithms found in the fuzzy scheduling literature. The main finding of this research indicates that in the presence of uncertainty, the shape of the fuzzy project cash flow curve varies considerably from the well-established cumulative cost curve (S-curve). Furthermore, the application of the proposed methodology in decision support software may prove useful in both the evaluation of project proposals (during feasibility studies) and the assessment of working capital requirements (in project execution).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

Fuzzy versus Probabilistic Benefit/cost Ratio Analysis for Public Work Projects

The benefit/cost (B/C) ratio method is utilized in many government and public work projects to determine if the expected benefits provide an acceptable return on the estimated investment and costs. Many authors have studied probabilistic cash flows in recent years. They introduced some analytical methods which determine the probability distribution function of the net present value and internal...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010