An O(n)-time algorithm for the minimal interval completion problem

نویسندگان

  • Christophe Crespelle
  • Ioan Todinca
چکیده

The minimal interval completion problem consists in adding edges to an arbitrary graph so that the resulting graph is an interval graph; the objective is to add an inclusion minimal set of edges, which means that no proper subset of the added edges can result in an interval graph when added to the original graph. We give an O(n2)-time algorithm to obtain a minimal interval completion of an arbitrary graph. This improves the previous O(nm) time bound for the problem and lower this bound for the first time below the best known bound for minimal chordal completion.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An O(n2) algorithm for the minimal interval completion problem

The minimal interval completion problem consists in adding edges to an arbitrary graph so that the resulting graph is an interval graph; the objective is to add an inclusion minimal set of edges, which means that no proper subset of the added edges can result in an interval graph when added to the original graph. We give an O(n) time algorithm to obtain a minimal interval completion of an

متن کامل

Mathematical Analysis of Optimal Tracking Interval Management for Power Efficient Target Tracking Wireless Sensor Networks

In this paper, we study the problem of power efficient tracking interval management for distributed target tracking wireless sensor networks (WSNs). We first analyze the performance of a distributed target tracking network with one moving object, using a quantitative mathematical analysis. We show that previously proposed algorithms are efficient only for constant average velocity objects howev...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

Minimal Proper Interval Completions

Given an arbitrary graph G = (V,E) and a proper interval graph H = (V, F ) with E ⊆ F we say that H is a proper interval completion of G. The graph H is called a minimal proper interval completion of G if, for any sandwich graph H ′ = (V, F ′) with E ⊆ F ′ ⊂ F , H ′ is not a proper interval graph. In this paper we give a O(n+m) time algorithm computing a minimal proper interval completion of an...

متن کامل

Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010