A Deployment Strategy for Multiple Secondary Payloads on the MLV-05 Mission
نویسنده
چکیده
The Department of Defense (DoD) Space Test Program (STP) provides space flight for qualified DoD sponsored experiments at no charge to the experimenter, via the DoD-Space Experiments Review Board (DoD-SERB). Through the Air Force Space Command, STP is supplied with a Medium Class Launch Vehicle approximately every 4 years for SERB payloads. The next launch will be on a Delta IV-Medium in the fiscal year 2006. Originally scheduled for 2005 the mission has been temporarily named "MLV-05". STP has initiated mission design activities and has defined a baseline mission. The current baseline is for an Eastern Range launch to low earth orbit (LEO). Five (possibly six) separate spacecraft will be deployed from an EELV Secondary Payload Adapter (ESPA) ring after which the launch vehicle’s upper stage will take the primary payload to a geosynchronous transfer orbit (GTO). This paper discusses the development of a deployment strategy for the MLV-05 secondary payloads subject to the payloads’ requirements, the constraints of the separation system, and the timeline for the primary payload’s orbit maneuver. The objective is to deploy the secondary payloads in a manner that limits the possibility of close approaches among these payloads and the upper stage following their separation. Because of differing ballistic coefficients the satellites will eventually fall into a natural order in the along track direction. This order dictates the sequence in which they are deployed. The uncertainty in the deployment springs determines the minimum safe difference in the deployment velocities. Three of the satellites in the current baseline mission will form the TechSat 21 formation flying experiment. Physical constraints require the three TechSats to occupy alternating locations on the ESPA ring. Each TechSat can be paired with the satellite opposite it on the ring and the timeline for the deployment can be reduced by deploying each pair together, but in opposite directions. The strategy takes into consideration the desire of the TechSats to establish their formation several days after deployment. Should one of the TechSats fail to deploy its solar array the difference in deployment velocities allows adequate time for the others to perform collision avoidance maneuvers, if needed.
منابع مشابه
Automatic Payload Deployment System
The ability to precisely emplace stand-alone payloads in hostile territory has long been on the wish list of US warfighters. This type of activity is one of the main functions of special operation forces, often conducted at great danger. Such risk can be mitigated by transitioning the manual placement of payloads over to an automated placement mechanism by the use of the Automatic Payload Deplo...
متن کاملQuasi Random Deployment Strategy for Reliable Communication Backbones in Wireless Sensor Networks
Topology construction and topology maintenance are significant sub-problems of topology control. Spanning tree based algorithms for topology control are basically transmission range based type construction algorithms. The construction of an effective backbone, however, is indirectly related to the placement of nodes. Also, the dependence of network reliability on the communication path undertak...
متن کاملPhysiological Components and Physical Combat Readiness in Warm, Cold, and High Altitude Extreme Environmental Conditions: Narrative Review
Military forces based on their mission have to deployment and executed military operation in extreme environmental conditions, they simultaneously experience nutritional and sleep disorders and endure mental stress. This condition plays essential role in body hemostasis, military fitness components and finally commanded mission's success. Neglecting above mentioned condition physiological respo...
متن کاملA Standards-Based Integration Platform for Reconfigurable Unmanned Aircraft Systems
This paper addresses the system design and integration challenges involved in meeting the requirements for coordinated deployment of multiple re-configurable Unmanned Aircraft Systems (UAS). It will present and discuss an open standards based software architectural approach that demonstrably addresses – and simplifies these new and evolving issues. UAS developers are continuously challenged to ...
متن کاملDesign, Modeling and Evaluation of a 2.4GHz FHSS Communications System for NarcisSat
1. Abstract Communication subsystems generally consume the majority of power and a significant fraction of mass and volume for picosatellites, and thus their design is critical to the overall satellite and mission plans. The available data bandwidth defines the types of payloads that can be accommodated. Until now, most CubeSat designs have used the 2m (145MHz) and 70cm (437MHz) bands. We prese...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002