A Case History in Optimum Inventory Scheduling

نویسندگان

  • George Schussel
  • Steve Price
چکیده

This paper describes four computer programs that perform what were formerly management-decision functions in inventory scheduling. The first program solves the classical EOQ problem (uniform inventory usage) with quantity discounts. The second program, Economic Requirement Batching (ERB), uses dynamic programming, a heuristic search algorithm, and the relation between shipment size and material cost to locate the optimum delivery schedule for any deterministic schedule of discrete (irregular) requirements. The third program, the Alternative Delivery Schedule Evaluator (ADSE), compares any alternative delivery schedules that meet requirements; it calculates all costs associated with inventory and displays both the optimum alternative and the opportunity losses incurred by inferior alternatives. The fourth program, the Alternative Delivery Schedule Generator (ADSG), solves the difficult problem of optimally scheduling inventory in those cases requiring vendor production to special specifications and, accordingly, where the exact price of the item is unknown and depends on the manner in which it is produced. This situation is differentiated from ERB because ERB analyzes standard vendor shelf items that can be delivered according to any schedule. With little input data, ADSG generates a few highly efficient alternative delivery schedules upon which the vendor quotes. The returned bids are then evaluated by ADSE, which determines the optimum delivery schedule. Since over three years have elapsed between when this work was done and the publication of this article, it concludes with a view of the program's successes and failures and some relevant empirically observed relations.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum Aggregate Inventory in the Lot Scheduling Problem with Non-Zero Setup Time

In this paper, the minimization of the maximum aggregate inventory of all products for the common cycle time approach to the scheduling problem of a multi-products single machine system is considered. In the case of non-zero set up time and limited resources, a simply and easy to apply rule has been obtained for this optimization problem. Using this rule, one can obtain the optimal production s...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time

Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Operations Research

دوره 18  شماره 

صفحات  -

تاریخ انتشار 1970