The Time-Course and Cost of Telicity Inferences

نویسندگان

  • Andrea S. Proctor
  • Michael Walsh
  • Lance J. Rips
چکیده

Recent evidence suggests that perceivers have consistent intuitions regarding the boundedness properties of objects and events (Solomon, Proctor, & Rips, in preparation). This paper presents a self-paced reading study examining the speed and accuracy with which readers draw such telicity inferences during on-line language comprehension. Participants read sentences containing either a consumption verb (“consume”) or an observation verb (“monitor”) followed by either a mass or a count object (“ice water” vs. “ice cube”). Each sentence ended with an adverbial phrase that was either consistent or inconsistent with the telicity of the preceding event description (“in” or “for” adverbials), along with a comprehension question. Reading-time results suggest that comprehenders are slow to draw telicity inferences, even when the type of verb unambiguously determines the telicity of the sentence. However, responses to post-sentential comprehension questions suggest that verb and noun information together have a surprisingly robust influence on comprehenders’ telicity inferences, even in the face of supposedly unambiguous adverbial information. Together, these results suggest that comprehenders make use of all relevant information in making telicity inferences, but that they do so much more slowly than strongly incremental models of natural language understanding would predict (e.g., Marslen-Wilson & Tyler, 1980).

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Iterative Decision Rule to minimize cost of Acceptance Sampling Plan in Machine Replacement Problem

In this paper, we presented an optimal iterative decision rule for minimizing total cost in designing a sampling plan for machine replacement problem using the approach of dynamic programming and Bayesian inferences. Cost of replacing the machine and cost of defectives produced by machine has been considered in model. Concept of control threshold policy has been applied for decision making. If ...

متن کامل

Events: Modification, Aspect and Lexical Meaning Course Number: LSA.315

This course sets out with an examination of the role of events in accounting for inferential properties of modification. It presents a model of the logic of modification following the neo-Davidsonian mode of composition but reworking the Davidsonian framework. The approach is shown to accord with more intuitively appealing notions of event individuation and to afford a uniform treatment of indi...

متن کامل

The Telicity Parameter Revisited

The goals of this paper are threefold: First, to review some recent syntactic accounts of cross-linguistic differences in the expression of telicity in Slavic vs. Germanic languages. Second, I will argue that the parametric variation in the encoding of telicity cannot be based on a unidirectional specifier head agreement between the verbal functional head linked to the telicity of the VP and th...

متن کامل

Inferring Meaning from Syntactic Structures in Acquisition: The Case of Transitivity and Telicity.

This paper investigated children's ability to use syntactic structures to infer semantic information. The particular syntax-semantics link examined was the one between transitivity (transitive/intransitive structures) and telicity (telic/atelic perspectives; that is, boundedness). Although transitivity is an important syntactic reflex of telicity, it is neither necessary nor sufficient for pred...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004