Experimental study on the Wind Farm Substation Cable Installation Problem
نویسندگان
چکیده
The planning of wind farms exhibits several interesting problems. One of them is the minimum cost cable installation in wind farms. In this master thesis we regard a subproblem of it, namely the Substation Cable Installation Problem (SCIP). The SCIP deals with the minimum cable installation connecting wind turbines to a substation. It is therefore defined as follows: Given a set of coordinates for a substation and for a set of turbines, the turbines’ rating and a set of cable types, find the cost minimal cable installation such that all turbines are connected to the substation and the capacity constraints imposed by the installation are met. For this problem we identify several approaches from the literature for the SCIP as well as for related problems. We have adapted and implemented a part of these identified approaches. The implementation contains nine algorithms and heuristics which are presented in the main part of this thesis. Among them there is also a new integer linear program formulation and a new heuristic. Furthermore, we evaluate and compare the implemented algorithms and heuristics.
منابع مشابه
تعیین آرایش بهینه توربین ها برای مزرعه بادی در منطقه میل نادر
Nowadays, optimal placement of wind turbines in a wind farm is one of the major concerns of the wind farm designers. This paper concentrates on the optimal placement of wind turbines in a wind farm. The optimal placement of wind turbines has been carried out to maximize the output energy and minimize the investment cost of cable, road and wind turbines. For this purpose, Firstly, it should be d...
متن کاملThe offshore wind farm array cable layout problem: a planar open vehicle routing problem
In an offshore wind farm, the turbines are connected to a transformer by cable routes which cannot cross each other. Finding the minimum cost array cable layout thus amounts to a vehicle routing problem with the additional constraints that the routes must be embedded in the plane. For this problem, both exact and heuristic methods are of interest. We optimize cable layouts for real-world offsho...
متن کاملAn Extended Mathematical Programming Model to Optimize the Cable Trench Route of Power Transmission in a Metro Depot
The necessary electricity of the workshops and buildings (W&Bs;) located at the metro depot are provided by lighting power substation (LPS). To transmit electricity between LPS and W&Bs;, some trenches should be dig and the requisite cables should be located in the trenches. This paper presents a new mixed integer linear programming (MILP) long-term decision model to find ...
متن کاملSimulation and Study of Power Quality Issues in a Fixed Speed Wind Farm Substation
Power quality issues associated with the fixed speed wind farm substation located at Coimbatore district are investigated as the wind generators are tripping frequently. The investigations are carried out using two power quality analyzers, Fluke 435 and Dranetz PX5.8, with one of them connected at group control breaker of the 110 kV feeder and the other at the selected 0.69 kV generator busbar ...
متن کاملSimulated Annealing-Based Heuristics for Wind Farm Cabling Problems
In a wind farm, the cables connecting turbines and substations with the power grid significantly contribute to its installation cost. Minimizing the cabling cost traces back to a capacitated network flow problem similar to those arising in areas such as logistics and transport. In this work, we study the following cable layout problem: In the wind farm, the locations of turbines and substations...
متن کامل