Measuring Risk Element Criticality in a Fuzzy Project Network Using Trapezoidal Fuzzy Number Method

نویسندگان

  • N. Ravi Shankar
  • V. Sireesha
  • Usha Madhuri
چکیده

Risk management is a process aimed at enhancement, developing the level of security in an organization. It gives the organization a broad view of the risks that can affect its productivity and performance, and enables it to make appropriate risk management decisions. This paper presents a new fuzzy method for measuring risk element criticality in a fuzzy project network. There have been several attempts in the literature to apply fuzzy numbers to the critical path method. We have modified the former presented approaches to this problem using new trapezoidal fuzzy number method. At the end of the paper, an example is presented. The proposed method in this paper is more effective in determining the activity criticality, finding the fuzzy critical path, and obtaining schedule risk.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Research on Risk Element Transmission of Enterprise Project Evaluation Chain Based on Trapezoidal Fuzzy Number FAHP

In this study, a new modeling method based on trapezoidal fuzzy number FAHP has been proposed to solve the problem of risk element transmission in enterprise project evaluation chain. We firstly put forward enterprise project chain risk element transmission and constructs enterprise project chain risk element transmission tetrahedron model and then proposed the theory of enterprise project eval...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

On the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers

In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011