A Simulation-based Design Framework for Automated Material Handling Systems in 300mm Fabrication Facilities

نویسندگان

  • S. Chick
  • P. J. Sánchez
  • D. Ferrin
  • Dima Nazzal
  • Douglas A. Bodner
چکیده

This paper describes a methodology to tackle the problem of designing Automated Material Handling Systems (AMHS) for 300mm wafer fabrication facilities. The proposed framework divides the design process into two levels: architectural and elaborative. Prior to the design, fab data are preprocessed using simulation of manufacturing operations. The output data and fab requirements data are then profiled to aid in design decision making at the architectural level. Once architectural design decisions are made, lower-level design decisions are made and analyzed using a simulation model that incorporates the AMHS. Due to the potential number of alternatives and time constraints on the design process, we are exploring rapid model generation methods. In this paper, we describe our progress to date in creating this methodology.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Automated Reticle Handling: a Comparison of Distributed and Centralized Reticle Storage and Transport

The implementation of Automated Material Handling Systems (AMHS) in 300mm semiconductor facilities provides the opportunity to realize significant benefits in fabricator productivity and performance. The leverage associated with automated reticle delivery to photolithography process tools may be less apparent than a fab-wide AMHS. However, a high product mix environment requires the tracking, s...

متن کامل

Modeling and Performance Evaluation for Automated Material Handling Systems in a 300mm Foundry Fab

Modeling and Performance Evaluation for Automated Material Handling Systems in a 300" Foundry Fab Han-Pang Huang*, Chun-Tsong Wag* * Robotics Laboratory, Department of Mechanical Engineering National Taiwan University, Taipei, 10674 Taiwan Email: [email protected] TELEAX: (+886-2) 2363-3875 * Professor and correspondence addressee **Graduate student Abstract In this paper, a modeling meth...

متن کامل

A Spine Layout Design Method For Semiconductor Fabrication Facilities Containing Automated Material Handling Systems

A bay configuration arranged along a central spine and served by an automated monorail material handling system are common designs for the layout and material handling system in new semiconductor wafer fabrication facilities. This paper investigates the facility design problem in semiconductor fabrication facilities and proposes a procedure to determine the optimal spine layout design given a d...

متن کامل

Vehicle Clustering Phenomenon in Automatic Materials Handling Systems in 300mm Semiconductor Manufacturing

During design and implementation of the automatic materials handling system (AMHS) for a local 300mm semiconductor wafer fab (semiconductor fabrication plant), we observed and found an interesting phenomenon Vehicle Clustering Phenomenon (VCP) from the dynamics of automated vehicles: As time evolves, the distance between any two adjacent vehicles usually becomes very close enough as if all the ...

متن کامل

Simulation study for a proposed segmented automated material handling system design for 300-mm semiconductor fabs

With the increase in the size and weight of 300-mm wafers, the factory area must be enlarged accordingly. Due to the flow of material over long distances, the elimination of manual wafer handling has become necessary. Consequently, an automated material handling system (AMHS) is required for 300-mm semiconductor manufacturing facilities. The design of an AMHS must not only be capable of meeting...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003