Stress-reducing preventive maintenance model for a unit under stressful environment
نویسندگان
چکیده
We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example. & 2012 Elsevier Ltd. All rights reserved.
منابع مشابه
Integrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کاملA Preventive Maintenance Decision Policy Based on Economic-Technical and Applicibility Considerations
The present study is intended to develop a Preventive Maintenance (PM) policy for industrial applications, while considering two different objectives: the first objective is to optimize the total maintenance costs, i.e., the Preventive Maintenance (PM) and Emergency Maintenance (EM) Costs Per Unit Time. (CPUT). The second objective is to design the policy in such a way that the simplicity of it...
متن کاملA Preventive Maintenance Decision Policy Based on Economic-Technical and Applicibility Considerations
The present study is intended to develop a Preventive Maintenance (PM) policy for industrial applications, while considering two different objectives: the first objective is to optimize the total maintenance costs, i.e., the Preventive Maintenance (PM) and Emergency Maintenance (EM) Costs Per Unit Time. (CPUT). The second objective is to design the policy in such a way that the simplicity of it...
متن کاملAn Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems
General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...
متن کاملReliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants
Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Rel. Eng. & Sys. Safety
دوره 108 شماره
صفحات -
تاریخ انتشار 2012