Production and distribution lot sizing in a two stage supply chain
نویسندگان
چکیده
We develop a two stage model of a manufacturing supply chain. This two stage production transportation model features capacitated production in two stages, and a fixed cost (or concave cost) for transporting the product between the stages. We prove several properties of this model, which we call the Two Stage Production Distribution Problem (2SPDP) model. By placing “non-speculative” assumptions on production and transportation, we show that our model reduces to a related model, with one capacitated production stage with linear production cost, and transportation between two inventory locations with non-linear transportation cost. Finally, we present polynomial algorithms for this model under several different transportation cost structures and capacity assumptions.
منابع مشابه
Development of a novel lot sizing model with variable lead time in supply chain environment
Supply chain management (SCM) addresses the management of materials and information across the entire chain from suppliers to producers, distributors, retailers, and customer. The theory of supply chain management suggests that lead time reduction is a pioneer to the use of market mediation to reduce transaction uncertainty in the chain, which can be conceptualized as the primary goal of supply...
متن کاملA Polynomial Algorithm for the Multi-Stage Production-Capacitated Lot-Sizing Problem
The multi-stage lot-sizing problem with production capacities (MLSP-PC) deals with a supply chain that consists of a manufacturer with stationary production capacity and intermediaries (distribution centers or wholesalers) and a retailer to face deterministic demand. An optimal supply chain plan for the MLSP-PC specifies when and how many units each organization of the supply chain has to produ...
متن کاملOptimal Manufacturer-Retailer Policies in a Supply Chain with Defective Product and Price Dependent Demand
This study deals with a two-level supply chain consisting of one manufacturer and one retailer. We consider an integrated production inventory system where the manufacturer processes raw materials in order to deliver finished product with imperfect quality to the retailer, where number of defective product has a uniform distribution. The retailer receives product and conducts a 100% inspection....
متن کاملFuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain
The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...
متن کاملA seller-buyer supply chain model with exponential distribution lead time
Supply chain is an accepted way of remaining in the competition in today's rapidly changing market. This paper presents a coordinated seller-buyer supply chain model in two stages, which is called Joint Economic Lot Sizing (JELS) in literature. The delivery activities in the supply chain consist of a single raw material. We assume that the delivery lead time is stochastic and follows an exponen...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کامل