How run-of-river operation affects hydropower generation and value.

نویسندگان

  • Henriette I Jager
  • Mark S Bevelhimer
چکیده

Regulated rivers in the United States are required to support human water uses while preserving aquatic ecosystems. However, the effectiveness of hydropower license requirements nationwide has not been demonstrated. One requirement that has become more common is "run-of-river" (ROR) operation, which restores a natural flow regime. It is widely believed that ROR requirements (1) are mandated to protect aquatic biota, (2) decrease hydropower generation per unit flow, and (3) decrease energy revenue. We tested these three assumptions by reviewing hydropower projects with license-mandated changes from peaking to ROR operation. We found that ROR operation was often prescribed in states with strong water-quality certification requirements and migratory fish species. Although benefits to aquatic resources were frequently cited, changes were often motivated by other considerations. After controlling for climate, the overall change in annual generation efficiency across projects because of the change in operation was not significant. However, significant decreases were detected at one quarter of individual hydropower projects. As expected, we observed a decrease in flow during peak demand at 7 of 10 projects. At the remaining projects, diurnal fluctuations actually increased because of operation of upstream storage projects. The economic implications of these results, including both producer costs and ecologic benefits, are discussed. We conclude that regional-scale studies of hydropower regulation, such as this one, are long overdue. Public dissemination of flow data, license provisions, and monitoring data by way of on-line access would facilitate regional policy analysis while increasing regulatory transparency and providing feedback to decision makers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated Evaluation of Increasing Irrigation Efficiency and Reducing Discharge Impacts on Hydropower Generation of Basin Water Resources System(Case Study: Dez Irrigation Network – Dez Dam)

World electricity production today is heavily dependent on water resources. Studies have shown that global warming and climate changes will have significant impacts on available water resources to produce hydroelectric power. Considering that the reservoir dam in the catchment area of Dez is simultaneously a producer of hydropower and supplier of water needed for agricultural land, the aim of t...

متن کامل

A Nonlinear Model to Maximize Profit of Hydropower Plants in the Long-Run

The problem of hydropower plant profit maximization includes simultaneous programming of optimal utilization of water resources and participation in the power market. The present research was performed on a chain of hydropower plants within the Karoon river basin in Khuzestan Province (Iran) (i.e. Karoon­­ 3, Karoon 1, and Masjid Soleyman hydropower plants). In this research nonlinear programmi...

متن کامل

Optimization of cascade hydropower system operation by genetic algorithm to maximize clean energy output

Background: Several reservoir systems have been constructed for hydropower generation around the world. Hydropower offers an economical source of electricity with reduce carbon emissions. Therefore, it is such a clean and renewable source of energy. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue. Yet, reservoir systems are inefficiently ope...

متن کامل

Water level control system for a low-head run-of-river variable speed small hydropower plant

This paper presents part of the work carried out within the framework of a research project entitled Application of variable speed and intelligent control technologies to hydropower generation. Specifically, it is focused on the activities performed in order to achieve one of the main objectives of the project: the design of a water level control system for a low-head run-of-river variable spee...

متن کامل

Multi-Objective Sustainable Operation of the Three Gorges Cascaded Hydropower System Using Multi-Swarm Comprehensive Learning Particle Swarm Optimization

Optimal operation of hydropower reservoir systems often needs to optimize multiple conflicting objectives simultaneously. The conflicting objectives result in a Pareto front, which is a set of non-dominated solutions. Non-dominated solutions cannot outperform each other on all the objectives. An optimization framework based on the multi-swarm comprehensive learning particle swarm optimization a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Environmental management

دوره 40 6  شماره 

صفحات  -

تاریخ انتشار 2007