The semiconductor industry has been one of the driving forces of the “new” economy. It boasts of the exponentially growing performance of semiconductor devices, coupled with rapidly decreasing chip prices; however, it faces highly volatile demands, and copes with astronomical fab costs, most of which can be attributed to tool costs. The leadtime for purchasing tools is between 6 and 18 months, upon which tools quickly become obsolete. Thus, semiconductor companies need to recover their capital investment in the tools over a short period of time. We develop models and algorithms for strategic capacity planning, which is to determine the sequence and timing of acquiring tools. Strategic planning decisions are made in the presence of high uncertainty. Uncertainty comes from factors such as technology, the market, and its products, and becomes amplified by long leadtimes. Although capacity planning decisions need to be made in the presence of high uncertainty, early research and even some current practices overlook the stochastic nature of planning, with the exception of simple case analyses. An extensive review of literature can be found in Çakanyildirim et al. (1999) and Roundy et al. (2000). Typical methods of stochastic optimization include stochastic-linear programming, stochastic-integer programming, and Markov decisions processes; yet, they have not been able to solve real-world capacity planning problems on the scale faced by the semiconductor industry. This paper takes the stochastic-optimization approach, which explicitly incorporates randomness in the model. We assume nonstationary stochastic demand, with the expected demand for product families increasing over time. We also assume lost sales and no finished good inventory. As in Çakanyildirim et al. (1999), we continue to explore alternative approaches based on continuous-time models. The time at which a machine is purchased becomes a continuous-decision variable. These models are more compact than traditional stochastic-programming methods based on discrete-time models. It is hoped that the small dimensionality of continuous-time models will make the strategic capacity planning problem computationally tractable. In this paper, we model multiple resource types used for multiple product families. The resulting problem is related to the continuous relaxation of the lot-sizing problem. We present an efficient divideand-conquer algorithm that will find a locally optimal solution of this problem. A subroutine to this algorithm is the parametric minimum-cut problem.
منابع مشابه
A queuing-location model for in multi-product supply chain with lead time under uncertainty
Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...
متن کاملA FUZZY MINIMUM RISK MODEL FOR THE RAILWAY TRANSPORTATION PLANNING PROBLEM
The railway transportation planning under the fuzzy environment is investigated in this paper. As a main result, a new modeling method, called minimum risk chance-constrained model, is presented based on the credibility measure. For the convenience ofs olving the mathematical model, the crisp equivalents ofc hance functions are analyzed under the condition that the involved fuzzy parameter...
متن کاملCapacity price decisions, a manufacturing yield management perspective
This paper focuses on formulating capacity-price trade off problem in Yield Management for manufactur-ing industry by drawing motivation from the remarkable success of Yield Management (YM) implementation in airlines. In the current practice, there is no alternative and procedure for the manufacturer, as well as cus-tomers to take advantage of using the unfulfilled capacity in discounted offers...
متن کاملA Continuous-Time Strategic Capacity Planning Model*
Capacity planning decisions affect a significant portion of future revenue. In the semiconductor industry, they need to be made in the presence of both highly volatile demand and long capacity installation lead-times. In contrast to traditional discrete-time models, we present a continuous-time stochastic programming model for multiple resource types and product families. We show how this appro...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Manufacturing & Service Operations Management
دوره 5 شماره
صفحات -
تاریخ انتشار 2003