FACTS and D-FACTS: The Operational Flexibility Demanded by the Transmission Expansion Planning Task with Increasing RES

نویسندگان

  • R. C. Perez
  • G. C. Oliveira
  • M. V. Pereira
  • D. M. Falcão
  • F. Kreikebaum
  • S. M. Ramsay
چکیده

There are several reasons to explain why transmission system loading is less than 100%. These reasons include: (i) reliability, (ii) uncertainties associated with the demand growth forecast and (iii) different dispatch scenarios due to Renewable Energy Sources (RES), i.e., hydroelectricity, modern biomass, wind and solar power. The combination of these facts leads to high investments in the transmission systems to meet different dispatch scenarios and low loading throughout the year.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of CT and VT Connection Point on Distance Protection of Transmission Lines with FACTS Devices

This paper presents the effects of instrument transformers connection points on the measured impedance by distance relays in the presence of Flexible Alternating Current Transmission System (FACTS) devices with series connected branch. Distance relay tripping characteristic itself depends on the power system structural conditions, pre-fault operational conditions, and especially the ground ...

متن کامل

Effect of Distributed Power-Flow Controller (DPFC) on Power System Stability

Distributed flexible AC- transmission system (D-FACTS) is a recently advanced FACTS device with high flexibility and smaller size. The DPFC can control power flow in transmission lines, regulate bus voltages and it can also enhance stability margin in power grids. Adaptive-neural network-based fuzzy inference system (ANFIS) combines features of artificial neural network and fuzzy controller. Th...

متن کامل

Analyzing Impacts of FACTS Devices in Dealing with Short-Term and Long-Term Wind Turbine Faults

More than one hundred countries are using wind energy due to their easy implementation, cheap energy, and high energy efficiency. Implementation of FACTS devices in Wind Energy Conversion Systems (WECS) has been dramatically improved due to cooperative and accurate performance of FACTS devices. However, dealing with wind turbine faults promptly is crucial. Short-term and long-term faults may ha...

متن کامل

Congestion Management through Optimal Allocation of FACTS Devices Using DigSILENT-Based DPSO Algorithm- A Real Case Study

Flexible AC Transmission Systems (FACTS) devices have shown satisfactory performance in alleviating the problems of electrical transmission systems. Optimal FACTS allocation problem, which includes finding optimal type and location of these devices, have been widely studied by researchers for improving variety of power system technical parameters. In this paper, a DIgSILENT-based Discrete Parti...

متن کامل

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014