Project Cost Prediction Model Based on Fuzzy Theory

نویسندگان

  • Hailing Sun
  • Tianbao Su
چکیده

Project cost is the main factor contributing to the cost of construction, which accounts for a large proportion of the total investment. So strengthening the management and control of the project cost will be beneficial for the improvement of international competitiveness and conservation of social resource for construction enterprises. The article applies the basic principles of fuzzy mathematics to project cost prediction, and makes use of the evaluation information of typical project characteristics to carry out a systematic analysis of a prediction model of project cost. This calculation method reflects the similarities between projects and provides an efficient way for effective project cost prediction by a quantitative research and contrast on to-be-built and built projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

A Multi-Criteria Analysis Model under an Interval Type-2 Fuzzy Environment with an Application to Production Project Decision Problems

Using Multi-Criteria Decision-Making (MCDM) to solve complicated decisions often includes uncertainty, which could be tackled by utilizing the fuzzy sets theory. Type-2 fuzzy sets consider more uncertainty than type-1 fuzzy sets. These fuzzy sets provide more degrees of freedom to illustrate the uncertainty and fuzziness in real-world production projects. In this paper, a new multi-criteria ana...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JNW

دوره 8  شماره 

صفحات  -

تاریخ انتشار 2013