The development and extension of large cities induced a need for shallow tunnel in soft ground of building areas. Estimation of ground settlement caused by the tunnel excavation is important engineering point. In this paper, prediction of surface subsidence caused by tunneling in one section of seventh line of Tehran subway is considered. On the basis of studied geotechnical conditions of the region, tunnel with the length of 26.9km has been excavated applying a mechanized method using an EPB-TBM with a diameter of 9.14m. In this regard, settlement is estimated utilizing both analytical and numerical finite element method. The numerical method shows that the value of settlement in this section is 5cm. Besides, the analytical consequences (Bobet and Loganathan-Polous) are 5.29 and 12.36cm, respectively. According to results of this study, due tosaturation of this section, there are good agreement between Bobet and numerical methods. Therefore, tunneling processes in this section needs a special consolidation measurement and support system before the passage of tunnel boring machine. Keywords—TBM, Subsidence, Numerical Method, Analytical Method.
منابع مشابه
Introducing hard rock TBMs’ downtime analysis model with reference to past case histories’ data
The study of downtime and subsequently machine utilization in a given project is one of the major requirements of an accurate estimation of TBM performance and daily advance rate. Interestingly, while it is very common to report the components of downtime when discussing a tunneling project in the literature; there has not been a great amount of in-depth studies on this topic in the recent year...
متن کاملTBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period
In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a ...
متن کاملSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
متن کاملNumerical Modelling of Backfill Grouting Approaches in EPB Tunneling
One of the main issues involved during tunnel construction with tunnel boring machines is the tail gap grouting. This gap is between the external diameter of tunnel lining and the excavation boundary that is filled with high-pressure grouting materials. In this work, three different approaches of gap grouting modeling in the FLAC3D software are investigated with a special attention to the...
متن کاملA Numerical Investigation of TBM Disc Cutter Life Prediction in Hard Rocks
There is a direct relationship between the efficiency of mechanized excavation in hard rocks and that of disc cutters. Disc cutter wear is an important effective factor involved in the functionality of tunnel boring machines. Replacement of disc cutters is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate, and has a major effect on the total...