We consider the optimal scheduling of hydropower plants in a hydrothermal interconnected system. This problem, of outmost importance for large-scale power systems with a high proportion of hydraulic generation, requires a detailed description of the so-called hydro unit production function. In our model, we relate the amount of generated hydropower to nonlinear tailrace levels; we also take into account hydraulic losses, turbine-generator efficiencies, as well as multiple 0-1 states associated with forbidden operation zones. Forbidden zones are crucial to avoid nasty phenomena such as mechanical vibrations in the turbine, cavitation, and low efficiency levels. The minimization of operating costs subject to such detailed constraints results in a large-scale mixed-integer nonlinear programming problem. By means of Lagrangian Relaxation, the original problem is split into a sequence of smaller and easy-to-solve subproblems, coordinated by a dual master program. In order to deal better with the combinatorial aspect introduced by the forbidden zones, we derive three different decomposition strategies, applicable to various configurations of hydro plants (with few or many units, which can be identical or different). We use a Sequential Quadratic Programming algorithm to solve nonlinear subproblems. We assess our approach on a real-life hydroelectric configuration extracted from the south sub region of the Brazilian hydrothermal power system. #613/04. Received: 30/VIII/04. Accepted: 22/X/04. Correspondence to: Erlon C. Finardi “main” — 2006/3/9 — 15:58 — page 318 — #2 318 SOLVING THE UNIT COMMITMENT PROBLEM Mathematical subject classification: 90C90, 46N10, 47N10.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving A Fractional Program with Second Order Cone Constraint

We consider a fractional program with both linear and quadratic equation in numerator and denominator  having second order cone (SOC) constraints. With a suitable change of variable, we transform the problem into a  second order cone programming (SOCP)  problem.  For the quadratic fractional case, using a relaxation, the problem is reduced to a semi-definite optimization (SDO) program. The p...

متن کامل

A SIMPLIFIED LAGRANGIAN MULTIPLIER APPROACH FOR FIXED HEAD SHORT-TERM HYDROTHERMAL SCHEDULING

This paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. In fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. Thepower output of each hydro unit varies with the rate of water discha...

متن کامل

An Augmented Lagrangian Based Algorithm for Distributed NonConvex Optimization

This paper is about distributed derivative-based algorithms for solving optimization problems with a separable (potentially nonconvex) objective function and coupled affine constraints. A parallelizable method is proposed that combines ideas from the fields of sequential quadratic programming and augmented Lagrangian algorithms. The method negotiates shared dual variables that may be interprete...

متن کامل

Economic Generation and Scheduling of Power by Genetic Algorithm

The paper represents a genetic algorithm (GA) solution to the unit commitment problem for power generation in thermal power plant. GAs are general optimization techniques based on principles inspired from the biological evolution, using metaphors of mechanism such as natural selection, genetic recombination and survival of the fittest. A simple GA implementation using the standard crossover and...

متن کامل

Short-term Generation Scheduling with Transmission and Environmental Constraints Using an Augmented Lagrangian Relaxation

This paper proposes a new approach based on augmented Lagrangian relaxation for short term generation scheduling problem with transmission and environmental constraints. In this method, the system constraints, e.g. load demand, spinning reserve, transmission capacity and environmental constraints, are relaxed by using Lagrangian multipliers, and quadratic penalty terms associated with system lo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006