Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints

نویسندگان

  • Heng Li
  • Hong Zhang
چکیده

a r t i c l e i n f o Keywords: Multi-mode scheduling Ant colony optimization Renewable and nonrenewable resource constraints Construction projects An ant colony optimization (ACO)-based methodology for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) considering both renewable and nonrenewable resources is presented. With regard to the MRCPSP solution consisting of activity sequencing and mode selection, two levels of pheromones are proposed to guide search in the ACO algorithm. Correspondingly, two types of heuristic information and probabilities as well as related calculation algorithms are introduced. Nonrenewable resource-constraint and elitist-rank strategy are taken into account in updating the pheromones. The flowchart of the proposed ACO algorithm is described, where a serial schedule generation scheme is incorporated to transform an ACO solution into a feasible schedule. The parameter-selection and the resultant performance of the proposed ACO methodology are investigated through a series of computational experiments. It is expected to provide an effective alternative methodology for solving the MRCPSP by utilizing the ACO theory. In a construction process, available amounts of renewable and nonrenewable resources may be limited due to cost or other factors. Therefore the resource-constrained project scheduling problem (RCPSP) that has been intensively addressed in the manufacturing field has also been studied in the construction field. In the classical RCPSP, each activity has a single execution mode, that is, the resource requirements and associated duration for an activity are fixed. However, in the practical circumstance when limited resources are shared by multiple activities and the real-time amounts of available resources are thus flexible, some activities may have multiple execution modes to be selected, each mode having different resource amounts corresponding to different durations for each activity. Multiple selections of execution modes are considered to reduce delay of activities and idle times of resources in consideration of real-time amounts of resources. It is shown that the study on the multi-mode resource-constrained project scheduling problem (MRCPSP) is important and has been gradually paid attention in the construction field. The methodologies that have been developed for solving the MRCPSP include the exact and heuristic or meta-heuristic approaches. The exact methods include the exact enumeration schemes [29], a depth-first branch and bound procedure [31], as well as the dynamic programming approaches [27]. In addition, the enumeration scheme [12] for the single-mode was extended to the multi-mode case [32]. Finally, a branch-and-bound algorithm [33] was developed based on the exact procedure [19]. …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

متن کامل

An Optimal Approach for Minimization of Total Costs in the Multi-mode Resource-constrained Project Scheduling Problem

In this paper, we introduce a new multimode project scheduling problem, taking into account finish-to-start precedence relations among project activities as well as renewable and nonrenewable resources constraints. We suppose renewable resources are hired and not accessible in all time intervals of a project. In other words, there is a presumed release date as well as a mandated due date for ea...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015