An efficient hybrid iterated local search algorithm for the total tardiness blocking flow shop problem

نویسندگان

  • Imma Ribas
  • Ramon Companys
چکیده

This paper deals with the blocking flow shop problem and proposes an Iterated Local Search (ILS) procedure combined with a variable neighbourhood search (VNS) for the total tardiness minimization. The proposed ILS makes use of a NEH-based procedure to generate the initial solution, uses a local search to intensify the exploration which combines the insertion and swap neighbourhood and uses a perturbation mechanism that applies, d times, three neighbourhood operators to the current solution to diversify the search. The computational evaluation has shown that the insertion neighbourhood is more effective than the swap one, but it also has shown that the combination of both is a good strategy to improve the obtained solutions. Finally, the comparison of the ILS with an Iterated greedy algorithm and with a greedy randomized adaptive search procedure has revealed its good performance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria

In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...

متن کامل

An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking

Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...

متن کامل

Hybrid metaheuristic algorithms for the tardiness blocking flow shop problem

This paper proposes an Iterated Local Search (ILS) procedure and an Iterated Greedy (IG) algorithm, which are both combined with a variable neighbourhood search (VNS), for dealing with the flow shop problem with blocking, in order to minimize the total tardiness of jobs. The structure of both algorithms is very similar, but they differ in the way that the search is diversified in the space of s...

متن کامل

Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...

متن کامل

A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling

This paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. First, the problem is formulated as a mixed integer linear programming model. Then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. Two experiments are carried out to evaluate th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012