iii OPTIMAL INFRASTRUCTURE MAINTENANCE SCHEDULING PROBLEM UNDER BUDGET UNCERTAINTY

نویسندگان

  • Lu Gao
  • Zhanmin Zhang
چکیده

This research addresses a general class of infrastructure asset management problems. Infrastructure agencies usually face budget uncertainties that will eventually lead to suboptimal planning if maintenance decisions are made without taking the uncertainty into consideration. It is important for decision makers to adopt maintenance scheduling policies that take future budget uncertainty into consideration. The author proposes a multistage, stochastic linear programming model to address this problem. The author also develops solution procedures using the augmented Lagrangian decomposition algorithm and scenario reduction method. A case study exploring the computational characteristics of the proposed methods is conducted and the benefit of using the stochastic programming approach is discussed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

Allocation of Distributed Energy Resources for Microgrid Optimal Scheduling Considering Uncertainty

In this paper, a microgrid including a solar panel, a battery energy storage system and a diesel generator as the backup source are optimally is designed. The microgrid is considered as a part of a distribution network, that could be considered as local area. As microgrids can operate in grid-connected mode, the proposed algorithm investigates the minimization of the distribution network power ...

متن کامل

Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time

This paper investigates scheduling problems with simultaneous considerations of deterioration effects and deteriorating multi-maintenance activities on unrelated parallel machines. We examine two models of scheduling with the deterioration effect, namely the job-dependent and position-dependent deterioration model and the time-dependent deterioration model. We assume that each machine may be su...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Integrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty

In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied.  The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011