Predicting Shallow Landslide Initiation
نویسندگان
چکیده
The growing availability of digital topographic data and the increased reliability of precipitation forecasts invite modelling efforts to predict the timing and location of shallow landslides in hilly and mountainous areas in order to reduce risk to an ever-expanding human population. Here, we exploit a rare data set to develop and test such a model. In a 1·7 km catchment a near-annual aerial photographic coverage records just three single storm events over a 45 year period that produced multiple landslides. Such data enable us to test model performance by running the entire rainfall time series and determine whether just those three storms are correctly detected. To do this, we link a dynamic and spatially distributed shallow subsurface runoff model (similar to TOPMODEL) to an infinite slope model to predict the spatial distribution of shallow landsliding. The spatial distribution of soil depth, a strong control on local landsliding, is predicted from a process-based model. Because of its common availability, daily rainfall data were used to drive the model. Topographic data were derived from digitized 1 : 24 000 US Geological Survey contour maps. Analysis of the landslides shows that 97 occurred in 1955, 37 in 1982 and five in 1998, although the heaviest rainfall was in 1982. Furthermore, intensity–duration analysis of available daily and hourly rainfall from the closest raingauges does not discriminate those three storms from others that did not generate failures. We explore the question of whether a mechanistic modelling approach is better able to identify landslideproducing storms. Landslide and soil production parameters were fixed from studies elsewhere. Four hydrologic parameters characterizing the saturated hydraulic conductivity of the soil and underlying bedrock and its decline with depth were first calibrated on the 1955 landslide record. Success was characterized as the most number of actual landslides predicted with the least amount of total area predicted to be unstable. Because landslide area was consistently overpredicted, a threshold catchment area of predicted slope instability was used to define whether a rainstorm was a significant landslide producer. Many combinations of the four hydrological parameters performed equally well for the 1955 event, but only one combination successfully identified the 1982 storm as the only landslide-producing storm during the period 1980–86. Application of this parameter combination to the entire 45 year record successfully identified the three events, but also predicted that two other landslide-producing events should have occurred. This performance is significantly better than the empirical intensity– duration threshold approach, but requires considerable calibration effort. Overprediction of instability, both for storms that produced landslides and for non-producing storms, appears to arise from at least four causes: (1) coarse rainfall data time scale and inability to document short rainfall bursts and predict pressure wave response; (2) absence of local rainfall data; (3) legacy effect of previous landslides; and (4) inaccurate topographic and soil property data. Greater resolution of spatial and rainfall data, as well as topographic data, coupled with systematic documentation of landslides to create time series to test models, should lead to significant improvements in shallow landslides forecasting. Copyright © 2003 John Wiley & Sons, Ltd.
منابع مشابه
A multidimensional stability model for predicting shallow landslide size and shape across landscapes
The size of a shallow landslide is a fundamental control on both its hazard and geomorphic importance. Existing models are either unable to predict landslide size or are computationally intensive such that they cannot practically be applied across landscapes. We derive a model appropriate for natural slopes that is capable of predicting shallow landslide size but simple enough to be applied ove...
متن کاملCapturing landslide dynamics and hydrologic triggers using near-real-time monitoring
Near-real-time monitoring of active landslides or landslide-prone hillslopes can provide immediate notification of landslide activity, as well as high-quality data sets for understanding the initiation and movement of landslides. Typical components of ground-based, near-real-time landslide monitoring systems include field sensors, data acquisition systems, remote telemetry, and software for bas...
متن کاملColluvium supply in humid regions limits the frequency of storm-triggered landslides
Shallow landslides, triggered by extreme rainfall, are a significant hazard in mountainous landscapes. The hazard posed by shallow landslides depends on the availability and strength of colluvial material in landslide source areas and the frequency and intensity of extreme rainfall events. Here we investigate how the time taken to accumulate colluvium affects landslide triggering rate in the So...
متن کاملDebris-flow initiation from large, slow-moving landslides
In some mountainous terrain, debris flows preferentially initiate from the toes and margins of larger, deeper, slower-moving landslides. During the wet winter of 1997, we began real-time monitoring of the large, active Cleveland Corral landslide complex in California, USA. When the main slide is actively moving, small, shallow, first-time slides on the toe and margins mobilize into debris flows...
متن کاملPiezometric response in shallow bedrock at CB1: Implications for runoff generation and landsliding
[1] Experimental observations comparing two steep unchanneled valleys in the Oregon Coast Range, one intensively instrumented (CB1) and the other monitored for runoff but which produced a debris flow (CB2), shed light on the mechanisms of shallow flow in bedrock, its interaction with the vadose zone, and its role in generating landslides. Previous work at CB1 led to the proposal that during sto...
متن کامل