(Max, +) Optimization Model for Scheduling Operations in a Flow Network with Preventive Maintenance Tasks
نویسندگان
چکیده
The aim of this work is to propose a (max, +) optimization model for scheduling transfer operations on a flow network within a given maintenance framework. The case study involves the scheduling of oil batch transfer operations in coordination with valve maintenance activities in an oil-exporting seaport. The optimum schedule is determined through an intuitive, and synthetized mathematical model based on (max,+) algebra with the objective of minimizing financial penalties. Real operational constraints and goals in the seaport are modeled with data from an oil seaport in Venezuela. Results show the optimum schedule obtained from a concise and relatively simple optimization model which is the main contribution of this work.
منابع مشابه
Scheduling Operations in a Flow Network with Flexible Preventive Maintenance: A (max, +) Approach
The following work proposes a (max,+) optimization model for scheduling operations on an oil seaport considering flexible maintenance activities on valves. The work is based on previous results for the same case study, where fixed maintenance was studied in the framework of scheduling oil transfer operations through a pipeline network. The case study is a Venezuelan seaport for oil export and r...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملA Mathematical Model for HVLV Systems Scheduling and Optimization With Periodic Preventive Maintenance Using (max, +) Algebra
The High-Variety, Low-Volume (HVLV) scheduling problem is one of the most arduous combinatorial optimization problems. This paper considers an interesting formulation of the HVLV scheduling problem using (max, +) algebra while periodic Preventive Maintenance (PM) is considered. Maintenance is time based since activities are periodically fixed: maintenance is required after a periodic time inter...
متن کاملA Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملModeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities
Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...
متن کامل