ACO Applied to Switch Engine Scheduling in a Railroad Yard

نویسندگان

  • Jodelson A. Sabino
  • Thomas Stützle
  • Mauro Birattari
  • José Eugênio Leal
چکیده

This reasearch studies ACO algorithms for the switch engine scheduling in a Railroad Yard. The cars are moved individually or grouped into blocks by a set of locomotives called switch engines which are dedicated to moving around the cars in the yard. The need for moving comes from the fact that the arriving trains are disassembled into blocks of cars, undergo some operations like, loading , unloading and cleaning and finally are assembled into a new train. Each moving request is called a switch order. The decision of which switch engine will execute which switch order and the sequence of that executution is the core of our problem. The optimization of this schedule reduces the overall operational costs of the yard as weel as the time to assemble new trains, thus leading to a more productive railroad system. The problem can be summarized as follows: Given the information about the railroad yard layout, the switch engines currently located in it and a list containing all pending planned switch orders the goal is to determine an assignment of switch engines to switch orders, and a sequencing of these such that none of the operational constraints are violated and the costs are minimized. The practical goal os the overall project is to develop a switch engine scheduling algorithm for the Tubarao Railroad Yard, located in Brazil, which is the largest railroad yard in Latin America. The switch engine scheduling problem is strongly connected to the multiple pickup and delivery problem with time windows (m-PDPTW), which is used to model passenger and good transportation. This is a well known NP-hard problem from which heuristic approaches have shown to produce solutions that are easy to implement and have a low sensitivity to changes in the original problem. A first contribution of our work is the adaptation of an ACO algorithm, in this case COMPETants [1] to the problem, introducing a number of railroad yard specific constraints to model the particularities of the railroad yard scenario. First tests using real-world instances showed that our algorithm might produce huge savings. Hence we decided to continue the research with further analysis and possibly improving the original algorithm. For these tests we have deployed an instance generator to produce additional sets of data based on parameters that describe the most important operational characteristics of the yard. In our initial tests, we examined the implementations of two different pheromone

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-objective Ant Colony Optimization Method Applied to Switch Engine Scheduling in Railroad Yards

This paper proposes an ant colony optimization algorithm to assist railroad yard operational planning staff in their daily tasks. The proposed algorithm tries to minimize a multi-objective function that considers both fixed and variable transportation costs involved in moving railroad cars within the railroad yard area. This is accomplished by searching the best switch engine schedule for a giv...

متن کامل

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

A Behavioral Intervention for Reducing Postcompletion Errors in a Safety-Critical System

OBJECTIVE We investigated the effectiveness of a theoretically motivated intervention at reducing procedural errors in train yard operations, where making these errors could be costly or life-threatening. BACKGROUND A widespread and persistent memory error that people commit on a daily basis is the postcompletion error (PCE), that is, forgetting to complete the final step of a procedural task...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006