Fuzzy versus Probabilistic Benefit/cost Ratio Analysis for Public Work Projects
نویسندگان
چکیده
The benefit/cost (B/C) ratio method is utilized in many government and public work projects to determine if the expected benefits provide an acceptable return on the estimated investment and costs. Many authors have studied probabilistic cash flows in recent years. They introduced some analytical methods which determine the probability distribution function of the net present value and internal rate of return of a series of random discrete cash flows. They considered serially correlated cash flows and the uncertainty of future capital investment and reinvestment rates and they presented some formulae for the B/C ratio for probabilistic cash flows. In the paper, the expected value and the variance of a probabilistic cash flow are obtained by means of moments. Then a probabilistic B/C ratio is given. Fuzzy set theory has the capability of representing vague knowledge and allows mathematical operators and programming to be applied to the fuzzy domain. The theory is primarily concerned with quantifying the vagueness in human thoughts and perceptions. The fuzzy B/C ratios are developed for a single investment project and for multiple projects having equal or different lives.
منابع مشابه
Economic Evaluation of Ostrich Production Using Fuzzy Approach in Sistan
This study aimed to economic evaluation of ostrich production in Sistan region by the use fuzzy conception in five platforms including (1 bird, 30 birds, 50 birds, 100 birds and 200 birds). The result showed that amount of benefit cost for 30, 50, 100 and 200 was 0.20, 0.26, 0.30, 0.31 and present value was 105, 549, 1460, 2927 million rials. According to the results obtained from present value...
متن کاملA New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets
Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...
متن کاملA Multi-Criteria Analysis Model under an Interval Type-2 Fuzzy Environment with an Application to Production Project Decision Problems
Using Multi-Criteria Decision-Making (MCDM) to solve complicated decisions often includes uncertainty, which could be tackled by utilizing the fuzzy sets theory. Type-2 fuzzy sets consider more uncertainty than type-1 fuzzy sets. These fuzzy sets provide more degrees of freedom to illustrate the uncertainty and fuzziness in real-world production projects. In this paper, a new multi-criteria ana...
متن کاملA New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment
The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common i...
متن کاملEconomic Analysis of Implementing Respirator Program or Ventilation System in a Manufacturing Environment
The techniques and methods of developing cost models for respirators are discussed. Models are developed and implemented in this study for nineteen types of respirators in two major classes (air-purifying and supplied-air) and one LEV system. One respirator model is selected for detailed discussion from among the twenty models. The technical cost method is used in constructing the cost models f...
متن کامل