The Effects of Project Management Certification on the Triple Constraint

نویسندگان

  • Joseph T. Catanio
  • Gary Armstrong
  • Joanne Tucker
چکیده

This research paper describes key information technology (IT) project management activities in terms of project scope, time, and cost management, namely the triple constraint. The authors contend that the ability to properly manage and execute these activities are the quintessential components that oftentimes drives whether projects succeed or fail. The literature shows that IT projects have a dismal success rate but successful projects have been on the rise. We attempt to determine if the increase of successful projects correlates to the increase in the number of certificated project managers. Empirical evidence is presented that indicates certified project managers do not perform project scope, time, and cost management activities better than uncertified project managers.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

بررسی امکان استقرار سیستم تجزیه و تحلیل عوامل خطرزا و نقاط کنترل بحرانی در فرآیند تولید مواد غذایی در ایران

The traditional methods is used to inspect based on the end-products in manufactures , yet. The Global movement is more commonly reffered to use HACCP system which its main characteristics is preventing contorl of hazards at all stages of food productions. The main goals of implementation of this project was based on three following points: 1-Preparation of a guidelines for application of HAC...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IJITPM

دوره 4  شماره 

صفحات  -

تاریخ انتشار 2013