Cost-penalized estimation and prediction evaluation for split-plot designs
نویسندگان
چکیده
منابع مشابه
Incorporating Cost and Optimizing Central Composite Designs for Split - Plot Response Surface Methodology Experiments
Complete randomization in many industrial and agricultural experiments is frequently impractical due to constraints in time, cost or existence of one or more hard-to-change factors. In these situations, restrictions on randomization lead to split-plot designs (SPD), allowing certain factor levels to be randomly applied to the whole plot units and remaining factor levels randomly to the subplot ...
متن کاملUnbalanced and Minimal Point Equivalent Estimation Second-Order Split-Plot Designs
Restricting the randomization of hard-to-change factors in industrial experiments is often performed by employing a split-plot design structure. From an economic perspective, these designs minimize the experimental cost by reducing the number of resets of the hard-tochange factors. In this paper, unbalanced designs are considered for cases where the subplots are relatively expensive and the exp...
متن کاملAn Algorithm for Finding D-e cient Equivalent-Estimation Second-Order Split-Plot Designs
Many industrial experiments involve restricted rather than complete randomization. This often leads to the use of split-plot designs, which limit the number of independent settings of some of the experimental factors. These factors, named whole-plot factors, are often, in some way, hard to change. The remaining factors, called sub-plot factors, are easier to change. Their levels are therefore i...
متن کاملModification of the saffron model for growth and yield prediction under different irrigation water salinity, manure application and planting methods
The Saffron Yield Estimation Model (SYEM) was modified for salinity conditions, cowmanure application and planting methods using two-year experiments data in Badjgah region ofIran. A split-split plot arrangement was conducted in complete randomized block design duringtwo years with irrigation water salinity levels (0.45 (fresh water, S1), 1.0 (S2), 2.0 (S3) and 3.0(S4) dS m-1) as the main plot,...
متن کاملUpdate formulas for split-plot and block designs
For the algorithmic construction of optimal experimental designs, it is important to be able to evaluate small modifications of given designs in terms of the optimality criteria at a low computational cost. This can be achieved by using powerful update formulas for the optimality criteria during the design construction. The derivation of such update formulas for evaluating the impact of changes...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Quality and Reliability Eng. Int.
دوره 23 شماره
صفحات -
تاریخ انتشار 2007