Model of Flexible Production Systems with Sub-Lines and Their GA Expressions

نویسندگان

  • Jaber Abu Qudeiri
  • Hidehiko Yamamoto
  • Rizauddin Bin Ramli
چکیده

The production engineer’s decision regarding buffer size in a flexible production system is one of the most important factors in maximizing production efficiency. In this paper, we propose a model Flexible Production System with Sub-lines (FPSS). By using the model, we can find the buffer size of FPSS by using GA. Also, we propose a new GA expression, referred to as a Matrix Encoding Method (MEM). This paper deals with an FPSS which consists of 5 main component lines, i.e. a main production line, parallel lines, rework path, feed-forward line and feeder line. Numerical examples show that after a number of operations based on the GA with MEM expression, the nearest optimal buffer size of FPSS could be found. The results of this study can be used to improve the production plant, and production engineers can use these results in their decisions on buffer size when they develop FPSS.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

متن کامل

Scheduling on flexible flow shop with cost-related objective function considering outsourcing options

This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...

متن کامل

Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007