New bounds and algorithms for the transshipment yard scheduling problem
نویسندگان
چکیده
In a modern rail–rail transshipment yard huge gantry cranes transship containers between different freight trains, so that hub-and-spoke railway systems are enabled. In this context, we consider the transshipment yard scheduling problem (TYSP) where trains have to be assigned to bundles, which jointly enter and leave the yard. The objective is to minimize split moves and revisits. Split moves appear whenever containers have to be exchanged between trains of different bundles, whereas revisits occur if a train has to enter the yard twice, because some container dedicated to this train was not available during its first visit. We extend the basic TYSP, so that additional real-world requirements of modern rail–rail yards, e.g., the one currently constructed in Hannover-Lehrte, are considered. We provide complexity proofs for different problem settings and present several heuristic procedures as well as one exact algorithm. The paper concludes with computational results showing the efficiency of the proposed algorithms.
منابع مشابه
Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملEfficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine
Just-in-time scheduling problem on a single batch processing machine is investigated in this research. Batch processing machines can process more than one job simultaneously and are widely used in semi-conductor industries. Due to the requirements of just-in-time strategy, minimization of total earliness and tardiness penalties is considered as the criterion. It is an acceptable criterion for b...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملThe Tactical Berth Allocation Problem with Quay Crane Assignment and Transshipment-related Quadratic Yard Costs
In this paper we integrate two decision problems arising in container terminals: the berth allocation problem, which consists of assigning and scheduling incoming ships to berthing positions, and the quay crane assignment problem, which assigns to incoming ships a certain QC profile (i.e. number of quay cranes per working shift). They are indeed strictly correlated, as the QC profile assigned t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 15 شماره
صفحات -
تاریخ انتشار 2012