The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic- Quality Paradigm (QLQP) for Production Scheduling in the Process Industries

نویسنده

  • Jeffrey Dean Kelly
چکیده

It is well-known that production scheduling can be largely categorized into open and closed-shops (Graves (1981)). Open-shops are job-shops, flow-shops, machine-shops and project-shops and deal exclusively with the assignment, sequencing and timing decisions (Pinedo (1995)). Closed-shops on the other hand also deal with the same three decision-groups as open-shops but they also must decide on the sizing of lots, charges, batches and movements in order to properly program production especially with finite inventory capacity. Arguably open-shops are a subset of closed-shops. The purpose of this article is to overview a production model and its data which is comprehensive enough to schedule the breadth and depth of all plants found in the process industries. We achieve this by extending the state and resource-task networks (STN and RTN; Kondili et. al. (1993) and Pantelides (1994)) to explicitly include the aspects of limited routings between unit-operations and other unit-operations up and downstream in the material flow path as well as dealing directly with the complexity of charge/batch-splitting into movements. We call this novel production modeling approach the unit-operation-stock superstructure (UOSS) which is the cross-product of the physical (units) and the procedural (operations) models or substructures.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

یکپارچه سازی برنامه‌ریزی و زمانبندی تولید در صنایع فرآیندی چند محصولی با سیستم تولیدی پیوسته

  One of the main elements of each supply chain is production. Production planning in multi-products process industries in which products are subjected to the complicated operational constraints is a very hard work because production of computed optimal volume should be compatible with operation scheduling constraints of production system. Thus, integration idea has been proposed for required d...

متن کامل

Developing a Paradigm for Fair Valuation in Tehran Stock Exchange

The concept of value is of great importance for investors. The goal of different groups of investors is always to maximize the value of their capital. The aim of this research is developing factors effective on securities in capital market in order to develop a paradigm for fair valuation that leads investors to make better decisions. To study fair value in a precise and comprehensive way, effe...

متن کامل

Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles

In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...

متن کامل

Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

متن کامل

Economic Production Quantity in Reworkable Production Systems with Inspection Errors, Scraps and Backlogging

The classical economic production quantity (EPQ) model is a well-known and commonly used inventory control technique. Common assumptions in this model are that all units produced are of perfect quality and shortage is not allowed, since in practice shortage, non-conforming product or scrap items are possible, these assumptions will underestimate the actual required quantity. The objective of th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005