Genetic Algorithm Application in a Dynamic PCB Assembly with Carryover Sequence- Dependent Setups

نویسندگان

  • M. T. Yazdani Sabouni
  • Rasaratnam Logendran
چکیده

We consider a typical problem in the assembly of printed circuit boards (PCBs) in a two-machine flow shop system to simultaneously minimize the weighted sum of weighted tardiness and weighted flow time. The investigated problem is a group scheduling problem in which PCBs are assembled in groups and the interest is to find the best sequence of groups as well as the boards within each group to minimize the objective function value. The type of setup operation between any two board groups is characterized as carryover sequence-dependent setup time, which exactly matches with the real application of this problem. As a technical constraint, all of the boards must be kitted before the assembly operation starts (kitting operation) and by kitting staff. The main idea developed in this paper is to completely eliminate the role of kitting staff by assigning the task of kitting to the machine operator during the time he is idle which is referred to as integration of internal (machine) and external (kitting) setup times. Performing the kitting operation, which is a preparation process of the next set of boards while the other boards are currently being assembled, results in the boards to continuously enter the system or have dynamic arrival times. Consequently, a dynamic PCB assembly system is introduced for the first time in the assembly of PCBs, which also has characteristics similar to that of just-in-time manufacturing. The problem investigated is computationally very complex, meaning that finding the optimal solutions especially when the problem size gets larger is impossible. Thus, a heuristic based on Genetic Algorithm (GA) is employed. An example problem on the application of the GA developed is demonstrated and also numerical results of applying the GA on solving several instances are provided. Keywords—Genetic algorithm, Dynamic PCB assembly, Carryover sequence-dependent setup times, Multi-objective.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

متن کامل

Optimisation of assembly scheduling in VCIM systems using genetic algorithm

Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013