Esscad: Expert System Integrating Construction Scheduling with Cad Drawing

نویسنده

  • Shou Qing Wang
چکیده

This paper presents an expert system ESSCAD developed for integrating construction scheduling with CAD drawing. The system, which was developed mainly with knowledge-based system programming technique and software integrating technique, can automatically interpret the CAD drawings of a building and extract data of its building components, breakdown the project into activities, determine the logic dependencies among activities, estimate the work quantities and durations of activities, finally generate a primary construction schedule for the project. As it was integrated with a CAD drafting system AutoCAD and a scheduling software MS-Project, it retains the advanced functions of CAD drafting and network analysis. A sample application of ESSCAD to schedule a reinforced concrete frame structure building directly from its AutoCAD drawings is also presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

The ACPROM Model: An Expert System for Evaluating the Construction Progress

A persistent problem in construction is to documenting changes which occur in the field and preparing the as-built schedule. In current practice, deviations from planned performance can only be reported after significant time has elapsed. And manual monitoring on construction sites is costly and error prone. Availability of advanced portable computing, multimedia and wireless communication allo...

متن کامل

A Case Study of Applying Virtual Prototyping in Construction

The use of 3D computer-aided design (CAD) models to support construction project planning has been increasing in the previous year. 3D CAD models reveal more planning ideas by visually showing the construction site environment in different stages of the construction process. Using 3D CAD models together with scheduling software to prepare construction plan can identify errors in process sequenc...

متن کامل

A Hybrid Modeling for Continuous Casting Scheduling Problem

This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...

متن کامل

1999: Product-based Model Representation for Integrating 3d Cad with Computer Simulation

Computer-Aided Design (CAD) is widely used during the engineering design stage of construction projects. CAD generally contains a wealth of information regarding the facility to be constructed; this information can be effectively used for construction decision-making. This paper undertakes an investigation of the possibility of using a “product-based” model representation for integrating 3D CAD...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001