Job Shop Scheduling with Routing Flexibility and Sequence Dependent Setup-Times
نویسندگان
چکیده
This paper presents a meta-heuristic algorithm for solving a job shop scheduling problem involving both sequence dependent setup-times and the possibility of selecting alternative routes among the available machines. The proposed strategy is a variant of the Iterative Flattening Search (IFS) schema. This work provides three separate results: (1) a constraint-based solving procedure that extends an existing approach for classical Job Shop Scheduling; (2) a new variable and value ordering heuristic based on temporal flexibility that take into account both sequence dependent setup-times and flexibility in machine selection; (3) an original relaxation strategy based on the idea of randomly breaking the execution orders of the activities on the machines with a activity selection criteria based on their proximity to the solution’s critical path. The efficacy of the overall heuristic optimization algorithm is demonstrated on a new benchmark set which is an extension of a well-known and difficult benchmark for the Flexible Job Shop Scheduling Problem.
منابع مشابه
Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملA fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
متن کاملA Job Shop Scheduling Problem with Sequence-Dependent Setup Times Considering Position-Based Learning Effects and Availability Constraints
Sequence dependent set-up times scheduling problems (SDSTs), availability constraint and transportation times are interesting and important issues in production management, which are often addressed separately. In this paper, the SDSTs job shop scheduling problem with position-based learning effects, job-dependent transportation times and multiple preventive maintenance activities is studied. ...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملNew Routing Rules for Dynamic Flexible Job Shop Scheduling with Sequence-Dependent Setup Times
Flexible job shops are characterized by the existence of alternative –not necessarily identicalmachines, which permits parts to have different alternative routes in the shop. In a dynamic scheduling situation in which jobs continuously arrive over time, part routing rules are needed to deal with such routing flexibility as much as sequencing rules which define the order by which parts are admit...