Assessing and Improving Ramp-Up Capability
نویسندگان
چکیده
In times when product life cycles are decreasing, while market demands are increasing, manufacturing enterprises are confronted with the challenge of more frequent and more complex ramp-ups. Thus it becomes obvious that ramp-up management is going to be a topic enterprises have to focus on in the future. Since each ramp-up is unique concerning the product, the process, the technology, the circumstances and the coaction of these four factors, the knowledge of the ramp-up situation and the current ramp-up capability of the enterprise are fundamental requirements for the subsequent improvement of the ramp-up capability of the production system. In this article a methodology is going to be presented which can be used to define typical production ramp-up situations, to identify the current ramp-up capability of a production system and to improve it with respect to a specific situation. Additionally there will be a description of the functionality of a software-tool developed based on this methodology. Keywords—Assessment methodology, ramp-up, ramp-up capability, software-tool.
منابع مشابه
بررسی و تحلیل اثر استفاده از نرخ بارگیری سریع به منظور تأمین ذخیرهی اولیه بر قیمت برق و نوسانات آن
Frequency control, as an ancillary service, is usually provided by generation reserves. In modern generating units the ramp rate limit can be selected; e.g. their ramp rate can be selected to be either normal or fast. In this paper, the impact of selecting the fast ramp rate of generating units on electricity price and its volatility is investigated in simultaneous scheduling of energy and prim...
متن کاملMultivariate process capability indices on the presence of priority for quality characteristics
Multivariate Process Capability Indices (MPCI) show how well a manufacturing process can meet specifica-tion limits when quality characteristics enclose a relative correlation. Process capability is an important and commonly used metric for assessing and improving the quality of a production process. When quality charac-teristics of a product are correlated then an attractive comes close to MPC...
متن کاملIchnotaxonomic analysis and depositional controls on the carbonate ramp ichnological characteristics of the Deh-Sufiyan Formation (Middle Cambrian), Central Alborz, Iran
The trace fossil assemblages from the Unit 2 of Deh-Sufiyan Formation are described for the first time from The Central Alborz Range of northern Iran, improving the record of the assemblages in the Cambrian of the Middle East. Twenty-one ichnogenera have been identified in the Deh-Sufiyan Formation, namely Arenicolites, Bergaueria, Chondrites, Circulichnus, Cruziana, Diplichnites, Didymaulichnu...
متن کاملPower-Capacity and Ramp-Capability Reserves for Wind Integration in Power-Based UC Published in: IEEE Transactions on Sustainable Energy Special Section on Reserve and Flexibility for Handling Variability and Uncertainty of Renewable Generation
This paper proposes a power-based networkconstrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal with wind production uncertainty. These power and ramp requirements can be obtained from wind forecast information. Th...
متن کاملImproving Bandwidth Efficiency of FBMC-OQAM Through Virtual Symbols
Filter bank multicarrier (FBMC) systems that are based on offset quadrature amplitude modulation (OQAM), namely, FBMC-OQAM, have been criticized for their inefficiency in the use of spectral resources, because of the long ramp-up and ramp-down tails at the beginning and the end of each data packet, respectively. We propose a novel method for shortening these tails. By appending a set of virtual...
متن کامل