A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach

نویسندگان

  • Mostafa Salari
  • Morteza Bagherpour
  • Mohammad Hossein Reihani
چکیده

Time–cost trade-off problems (TCT) are well-known in project management contents. This approach normally applied for scheduling of a project especially where the project should be completed under pre-determined deadline. This paper aims to extend time-cost trade-off (TCT) problems in order to provide a well-organized mechanism for both scheduling and rescheduling processes of a project. The proposed mechanism includes project scheduling which concerns with the TCT problem, monitoring of project performance during execution phase using earned value management (EVM), and also predicting project future performance through statistical modeling. Once the predicted values of project performance indicate the necessity for rescheduling, the initial TCT problem is modified to determine a new mode for the execution of the project. In the proposed model, also several options have been considered with specific time and cost for an individual activity where options indicate different execution methods (EM) for the implementation of the whole project. Furthermore, due to vagueness and impreciseness associated with data of real case projects, the time and cost behavior of each option presumed as fuzzy numbers. The proposed control mechanism can help project managers to take the advantage of a comprehensive model to schedule, control, and reschedule a project through the life cycle. An illustrative case is then presented to successfully demonstrate the application of the proposed approach. 7

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...

متن کامل

AN EXTENSION TO STOCHASTIC TIME-COST TRADE-OFF PROBLEM OPTIMIZATION WITH DISCOUNTED CASH FLOW

In this paper, an efficient multi-objective model is proposed to solve time-cost trade off problem considering cash flows. The proposed multi-objective meta-heuristic is based on Ant colony optimization and is called Non Dominated Archiving Ant Colony Optimization (NAACO). The significant feature of this work is consideration of uncertainties in time, cost and more importantly interest rate. A ...

متن کامل

Presenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm

The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...

متن کامل

INVENTORY MODEL WITH DEMAND AS TYPE-2 FUZZY NUMBER: A FUZZY DIFFERENTIAL EQUATION APPROACH

An inventory model is formulated with type-2 fuzzy parameters under trade credit policy and solved by using Generalized Hukuhara derivative approach. Representing demand parameter of each expert's opinion is a membership function of type-1 and thus, this membership function again becomes fuzzy. The final opinion of all experts is expressed by a type-2 fuzzy variable. For this present problem, t...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Journal of Intelligent and Fuzzy Systems

دوره 28  شماره 

صفحات  -

تاریخ انتشار 2015