Chapter 10 SPACECRAFT DESIGN , STRUCTURE AND OPERATIONS
نویسنده
چکیده
SPACECRAFT DESIGN PROCESS Regardless of how long it takes, spacecraft design and development typically occur in phases identified as: requirements definition, conceptual design, preliminary design, and detailed (or critical) design. These phases and their sequential relationships are shown in Figure 10-1. The design and development of a spacecraft is an engineering process divided into identifiable phases. In the past, the spacecraft development process required several years to accomplish, especially if it was a government project. Recent advances in satellite manufacturing technology, coupled with the growth of commercial markets in satellite communications and imaging, have significantly shortened the process. This change is described by a former commander of U.S. Air Force Space Command: Spacecraft development begins by defining needs or requirements the system is to satisfy. For example, the need to gather and store weather images and data. Or, take photographic images with less than 15 meter resolution and transmit the information in real time. The spacecraft mission will be a major determiner of the type orbit chosen for the space craft. "...new commercial geosynchronous satellites are available 18 months after order—soon to be down to 12 months. For the small LEO systems, time from order to delivery is about three years...In contrast, the acquisition of national security systems runs 10 to 15 years... Next is the conceptual design phase, in which various system concepts which can satisfy the mission requirements are considered and subjected to analysis. The most proficient means to carry out the mission is selected and major risks, costs, and schedules are identified. The preliminary design phase follows conceptual design, and may stretch over a couple of years (Fig. 10-2). During this phase, variations of the concept chosen in the conceptual design phase are analyzed and refined. Subsystem and component level specifications are defined and major documents such as the interface control document are written. Anticipated performance of systems and subsystems is substantiated and, from the detailed specifications, a preliminary parts list is identified. the same plant will build three hundred Teledesic satellites in three years and 15 Global Positioning System (GPS) satellites in seven years...”
منابع مشابه
Design study of 8 meter monolithic mirror UV/optical space telescope
The planned Ares V launch vehicle with its 10 meter fairing shroud and 55,000 kg capacity to the Sun Earth L2 point enables entirely new classes of space telescopes. NASA MSFC has conducted a preliminary study that demonstrates the feasibility of launching a 6 to 8 meter class monolithic primary mirror telescope to Sun-Earth L2 using an Ares V. Specific technical areas studied included optical ...
متن کاملTimeline as Unifying Concept for Spacecraft Operations
The notion of Timeline has been used informally in spacecraft operations software for some time, but it has not heretofore been formalized and unified either syntactically or semantically. We have formalized and unified the Timeline so that the commonality can be exploited to reduce the cost of developing and using spacecraft operations software. The Timeline can then be used as the common data...
متن کاملIterative Repair Planning for Spacecraft Operations Using the Aspen System
This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflic...
متن کاملMission Operations Design for Lunar Sample Return as field-tested in an Analogue deployment to the Sudbury Impact Structure
A Mission Operations Design will be described for an analogue robotic sample return mission on the far side of the Moon in the South Pole-Aitken Basin. The analogous site will be within the Sudbury Impact Structure. This scenario will use a rover acting alone supported by a single relay spacecraft. The structure established and tested will offer lessons for improving decision making and reducin...
متن کاملPlanning Coverage Campaigns for Mission Design and Analysis: Clasp for the Proposed Desdyni Mission
Mission design and analysis present challenges in that almost all variables are in constant flux, yet the goal is to achieve an acceptable level of performance against a concept of operations, which might also be in flux. To increase responsiveness, our approach is to use automated planning tools that allow for the continual modification of spacecraft, ground system, staffing, and concept of op...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003