The Lantirn Paperless Depot a Computer - Integrated Repair System
نویسندگان
چکیده
One of the premier technological programs in the Air Force today is the Low Altitude Navigation and Targeting Infrared for Night (LANTIRN) system. This major program currently being fielded for our tactical forces represents advanced electronics technology not only in the weapon system itself but also in its sup-
منابع مشابه
The Paperless Factory: A Review of Issues and Technologies
In this era of digital technology and network communications, paper-based data management can be a bottleneck, slowing factory-wide information transfer. This study explores the evolution of paperless communication in a factory environment and reviews some of the key technologies that contribute to the implementation of a paperless system including digital communication, the virtual factory, co...
متن کاملAn Interactive Allocation for Depot-Customer-Depot in a Multi Aspect Supply Chain Network
Supply chain excellence has a real huge impact on business strategy. Building supply chains (SCs) as flexible system represents one of the most exciting opportunities to create value. This requires integrated decision making amongst autonomous chain partners with effective decision knowledge sharing among them. The key to success lies in knowing which decision has more impact on the supply chai...
متن کاملNew Strategy of Grid Connected Photovoltaic System Using Module Integrated Converters with B4 Inverter to Overcome Partial Shading Effect
This paper proposes a new configuration for solar energy conversion systems. One challenging issue of the photovoltaic (PV) systems is partial shading, and in this paper Module Integrated Converters (MIC) are used to overcome this problem in PV arrays. A few boost converters are employed as MICs to mitigate the shading effect. Furthermore, to reduce the cost and to increase the system performan...
متن کاملDevelopment of Model and Algorithm for Depot Balancing Multi-Depot Vehicle Scheduling Problem Considering Depot Balancing
The main of multi-depot vehicle scheduling problem (MDVSP) is to schedule the timetabled trips using limited resources, optimally. The problem is very important in the management of the transportation systems. One of the most useful ways to better manage these systems is to consider the real conditions including depot balancing constraints. To normalize the number of vehicles departed from each...
متن کاملDesign of Computer Integrated Manufacturing System for Irankhodro Auto Industry
Computer-integrated manufacturing (CIM), technologies are presented as solutions to manufacturing organizations, which need to perform well in all customer-related dimensions simultaneously. In the literature, CIM technologies providing such benefits as more frequent production changes, reduced inventory level, improved ability of producing complex parts with a high degree of accuracy and repea...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010