Integrated Construction Project Management System Based On Ifc And Iso9001: 2000
نویسندگان
چکیده
We present a conceptual framework enabling to manage broad set of activities supported by multi-module software application for construction project management. The proposed structure is based on a common building information model (the industry standard IFC Model – ISO PAS 16739), the ISO 9001:2000 Quality Management System, for high-level process specification, and an integrated software infrastructure encompassing the product and process information exchange among the CAD-ERP and Scheduling Systems that support IFC. In this context, we developed Construction Management Phases for Software Interoperability, Organizational and IT Management Processes with using of ARIS methodology in order to implement IFC views. Based on this, we outline a web-based environment enabling to plug in all component tools via a common client, providing a coherent GUI.
منابع مشابه
Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling
Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...
متن کاملAn integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project
The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...
متن کاملDesign of an enhanced Integrated Management System with Customer Experience Focus: The Business Process Framework (also known as eTOM) and ISO9001 together
The purpose of this paper is to suggest an enhanced Process model with customer experience focus and its related documentation structure applicable to many industrial contexts. Since the Business Process Framework, also known as eTOM, is originally a Process Model for Telco industry and now being used broadly in many industries, ISO9001 is a historical and generic standard with customer focus, ...
متن کاملIFC-Based Construction Engineering Domain Otology Development
The essence of the 21st century is knowledge economy. Knowledge has become the key resource of economic growth and social development. Construction industry is no exception. Because of information management. The only way to improve the level of construction project management is to set up a kind of effective knowledge accumulation mechanism. This paper first introduced the IFC standard and the...
متن کاملImplementation of the integrated management dashboard for learning processes based on ISO 29990
The current research is trying to identify the effective modules (system modules) that form the integrated e-learning dashboard for educational processes and learning opportunities based on ISO 29990 in the municipality of Tehran. The educational process management system, which is currently providing classroom training services, is able to improve the situation by incorporating integrated mana...
متن کامل