The Spear 3 Light Source

نویسندگان

  • J. Corbett
  • R. Akre
  • P. Bellomo
  • R. Boyce
  • L. Cadapan
  • R. Cassel
  • B. Choi
  • R. Fuller
  • A. Garren
  • P. Rodriguez
چکیده

SPEAR 3 is an upgrade of the 18-cell SPEAR 2 storage ring to 3GeV beam energy, 18nm-radian emittance and up to 500mA circulating current. The existing arrangement of photon beam lines remains largely unchanged, but opportunities arise for additional ID and dipole radiation exit ports. For optimum beam stability, the entire tunnel floor will be excavated and replaced with reinforced concrete. The magnet/vacuum-chamber supports will be mounted on rigid steel rafts (3 per cell). The cable plant and RF drive will be installed ahead of time while the power supplies, tunnel floor and pre-assembled rafts will be installed in a 6-month shutdown beginning April, 2003.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study of Low β y Straight Section in SPEAR 3 1

The SPEAR 3 light source [1] has two 7.6 m straight sections one of which is available for new insertion devices (ID). By reducing the vertical β y function at the center of the straight from 9.8 m to 1.5 m, the beam size can be decreased from 44 µm to 17 µm to reduce the ID gap, but the ID length may be limited by the increased β y variation in the ID. Alternatively , a " double waist " optics...

متن کامل

An Ultra-violet Light Monitor for Spear3

A synchrotron light monitor is an essential tool for operating a storage ring. For SPEAR3, the upgrade of the SPEAR storage ring, the light monitor was designed not only for monitoring the beam presence but also to measure beam parameters. To minimize diffraction effects, UV light around 200 nm is used to image the electron source rather than visible light. At 200 nm, the rms diffraction spot i...

متن کامل

Spear 3 - a Low Emittance Source for Ssrl*

SSRL is planning to upgrade the 3 GeV SPEAR storage ring in FY 2002 to reduce the emittance from 160 nm-rad to 18 nm-rad and to increase the beam current from 100 to 200 mA, and then towards 500 mA as photon beam lines are upgraded. The core of the ’SPEAR 3’ project includes new magnets and power supplies for a DBA lattice, vacuum chamber, and a modedamped RF cavity system. Beam lines will see ...

متن کامل

SPEAR III A Brighter Source at SSRL

By replacing the magnets and vacuum chamber for the 3 GeV SPEAR II storage ring, the natural emittance of the machine can be reduced from 130 to 18 nm-rad and the stored current can be raised from 100 to 200 mA with a 50 h lifetime. This configuration increases focused photon flux for insertion device beamlines by an order of magnitude and the photon brightness for future undulators would excee...

متن کامل

Multi - Bunch Longitudinal Dynamics and Diagnostics via a Digital Feedback System at PEP - II , DA NE , ALS and SPEAR

A bunch-by-bunch longitudinal feedback system based on a programmable DSP architecture is used to study coupled-bunch motion and its sources. Experimental results are presented from PEP-II, DA NE, ALS and SPEAR to highlight the operational experience from 4 installations, plus show novel accelerator diagnostics possible with the digital processing system. Modal growth and damping rates are meas...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002