Valuing flexible operating strategies in nickel production under uncertainty

نویسندگان

  • C. Bao
  • M. Mortazavi-Naeini
  • S. Northey
  • T. Tarnopolskaya
  • Z. Zhu
چکیده

With increasing global demand for nickel (which is a key component of stainless steel) the focus of mineral industry is currently on the abundant low-grade nickel laterite reserves. The extraction of nickel from the low-grade laterites is a technically difficult and expensive process and, as a result, the profitability of nickel production projects is highly affected by uncertainty over future market conditions. The project value can be increased by utilizing flexible operating strategies in response to changing future market conditions and Real Options analysis provides a suitable tool for optimizing flexible operating strategies over a long planning horizon in the face of uncertainty. This paper presents the first study on the valuation of flexible operating strategies in a realistic nickel laterite production system under uncertainty of nickel price and exchange rate. In this paper, the production of ore from the three hypothetical nickel laterite mines being fed to a central processing facility is studied. The common features of nickel laterite production, such as a two-fraction (limonite and saprolite) structure of the laterite ore body, layering of each fraction, with different ore grades (concentration of nickel) in each layer, and a simultaneous mining of several ore bodies, are incorporated into the model. It is common in the minerals industry that the ore from each mine is blended to provide as constant a feed rate and grade as possible to the processing facility. However, such a constant feed strategy may not generate the best financial return. In this paper, we investigate whether higher returns can be achieved by adopting a flexible strategy of switching, at prescribed intervals of time, between different feed rates of ore from the three mines that have different quality of nickel laterite. Such flexible strategy allows the operator to change the production rate of nickel in response to changing projected market conditions. In this paper, we use an approximate stochastic dynamic programming framework in the form of the Least Squares Monte Carlo (LSM) method, which we extend to multiple switching options problem that incorporates complex features of nickel laterite production. In addition, an approach that combines a genetic algorithm (GA) with the Monte Carlo simulations is developed for preliminary assessment of options and for estimating the upper bounds on the strategy values. We compare the value (in terms of the expected discounted cash flow) of the optimal profit-maximising switching strategy for 10 year planning horizon with the NPV value of a constant feed strategy, commonly used in the mining industry. Numerical results show that the flexibility to selectively blend the ore from each mine in response to projected market conditions considerably increases the expected cash flow and the probability of larger profits, while decreasing the probability of smaller profits.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal flexible capacity in newsboy problem under stochastic demand and lead-time

In this paper, we consider a newsvendor who is going to invest on dedicated or flexible capacity, our goal is to find the optimal investment policy to maximize total profit while the newsvendor faces uncertainty in lead time and demand simultaneously. As highlighted in literature, demand is stochastic, while lead time is constant. However, in reality lead time uncertainty decreases newsvendor's...

متن کامل

MULTI-OBJECTIVE ROUTING AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS UNDER UNCERTAINTY

The efficiency of transportation system management plays an important role in the planning and operation efficiency of flexible manufacturing systems. Automated Guided Vehicles (AGV) are part of diversified and advanced techniques in the field of material transportation which have many applications today and act as an intermediary between operating and storage equipment and are routed and contr...

متن کامل

Valuing flexibility in demand-side response: A real options approach

The investment interests in the electricity industry are transmitted through various mechanisms to other economic activities. This paper considers methods for esteeming the adaptability of demand-side response (DSR) in its capacity to react to future uncertainties. The capacity to evaluate this adaptability is particularly critical for vitality frameworks speculations given their extensive and ...

متن کامل

A Resilient Supply Chain Network Design Model with a Novel Fuzzy Programming Method under Uncertainty and Disruptions: A Real Industrial Approach

Nowadays, the design of a strategic supply chain network under the incidence of disruption is regarded as one of the important priorities of governments. Supplying sustainable petrochemical products is considered as a strategic goal by managers who require reliable infrastructure design. Crisis conditions such as natural disasters and sanctions have a destructive effect on the raw materials and...

متن کامل

The Impact of Budget Constraints on Flexible vs. Dedicated Technology Choice

This paper studies the flexible-versus-dedicated technology choice and capacity investment decisions of a multi-product firm under demand uncertainty in the presence of budget constraints. The firm operates under a capital budget for financing the capacity investment, and an operating budget, which is uncertain in the capacity investment stage, for financing the production. We investigate how t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013